Inspections for the day of: Tuesday, July 11, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-02251 Pressure Test7/10/20007/11/20007/11/2000 12:00:00 AMAFAIL
###-#### p/t final
MEC00-02286 Final7/10/20007/11/20007/11/2000 12:00:00 AMAPASS
###-#### Sign occ. card 7/11/00 4:17:46 PM
MEC00-02325 Rough-in7/10/20007/11/20007/11/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/10/2000 at 16:48:46. Contact: ###-####. Will do inspection along with hydronic inspection. 7/11/00 4:17:35 PM
MEC00-02329 Final7/11/20007/11/20007/11/2000 12:00:00 AMPPASS
BILL-- ###-#### GAS LINE ONLY
MEC00-01986 Rough-in7/11/20007/11/20007/11/2000 12:00:00 AMPPASS
TML MICHELLE ###-#### R/I -RE-INSP
MEC00-01900 Rough-in7/11/20007/11/20007/11/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/11/2000 at 09:00:40. Contact: ###-####. C/N posted 7/12/00 10:45:40 AM
MEC00-01900 Pressure Test7/11/20007/11/20007/11/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/11/2000 at 09:01:34. Contact: ###-####.
MEC00-01943 Final7/11/20007/11/20007/11/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/11/2000 at 09:47:44. Contact: ###-####. Sign occ. card 7/12/00 10:45:53 AM
MEC99-02018 Final7/11/20007/11/20007/11/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/11/2000 at 10:16:16. Contact: ###-####. NO access 7/12/00 10:45:22 AM