Inspections for the day of: Thursday, July 11, 2002.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02047 Final7/10/20027/11/20027/11/2002 12:00:00 AMANR
###-#### water line and backflow
PLM02-02057 Sprinkler (Final)7/10/20027/11/20027/11/2002 12:00:00 AMAPASS
###-####
PLM02-02041 Sprinkler (Final)7/10/20027/11/20027/11/2002 12:00:00 AMAFAIL
reinspection corrections not made 7/11/2002 9:32:35 AM
PLM02-02061 Plumbing Rough-in7/10/20027/11/20027/11/2002 12:00:00 AMAPASS
r/i- ###-####- craig
PLM02-02062 Plumbing Rough-in7/10/20027/11/20027/11/2002 12:00:00 AMAPASS
###-#### ri ok with pan drains on the 2nd floor w.h.s 7/11/2002 9:04:00 AM
PLM02-02063 Water and/or Sewer7/10/20027/11/20027/11/2002 12:00:00 AMAPASS
JEFF ###-####
PLM02-00887 Final7/10/20027/11/20027/11/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/10/2002 at 16:43:23. Contact: ###-####. final ok with future lav waste perminatly capped 7/11/2002 9:32:00 AM
PLM02-02028 Water and/or Sewer7/11/20027/11/20027/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/11/2002 at 08:03:11. Contact: ###-####.
PLM02-02027 Water and/or Sewer7/11/20027/11/20027/11/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/11/2002 at 08:04:19. Contact: ###-####. c.o. required every 135 deg change in direction 7/11/2002 3:00:17 PM
PLM02-02022 Sprinkler (Final)7/11/20027/11/20027/11/2002 12:00:00 AMPFAIL
###-#### brandy leak at the 90 at the basse of the riser, test dcva 7/11/2002 2:21:12 PM
PLM02-02059 Plumbing Rough-in7/11/20027/11/20027/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/11/2002 at 08:12:09. Contact: ###-####.
PLM02-02031 Plumbing Rough-in7/11/20027/11/20027/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/11/2002 at 08:12:50. Contact: ###-####.
PLM02-02047 Water and/or Sewer7/11/20027/11/20027/11/2002 12:00:00 AMPPASS
PLM02-02070 Plumbing Rough-in7/11/20027/11/20027/11/2002 12:00:00 AMPPASS
troy- ###-#### r/i
PLM02-02041 Sprinkler (Final)7/11/20027/11/20027/11/2002 12:00:00 AMPNR
PLM02-02072 Sprinkler (Final)7/11/20027/11/20027/11/2002 12:00:00 AMPFAIL
###-#### need okay to bury, busy area, ok to cover tie in but needs to remove the pvc fip 90 and have dcva tested 7/11/2002 2:11:45 PM
PLM02-02071 Final7/11/20027/11/20027/11/2002 12:00:00 AMPPASS
per bill for w/h