PLM02-01520
| Final | 7/10/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01914
| Final | 7/10/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | A | PASS |
|
|
LANE ###-####
|
PLM02-01912
| Final | 7/10/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | A | PASS |
|
|
LANE ###-####
|
PLM02-02042
| Water and/or Sewer | 7/10/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 15:23:40. Contact: ###-####. water line stub to outside of building 7/11/2002 10:51:42 AM
|
PLM02-02068
| Groundwork | 7/11/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | A | PART |
|
|
need back water valve in basement 7/11/2002 2:04:34 PM
|
PLM02-01987
| Plumbing Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | P | PART |
|
|
###-#### helen out side water line and backflow device ok ok to cover 7/11/2002 2:25:04 PM
|
PLM02-02073
| Sprinkler (Final) | 7/11/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | P | PASS |
|
|
GLENN ###-####
|
PLM02-02006
| Final | 7/9/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### (Gerry the owner is only home in the pm) jana
|
PLM02-01838
| Plumbing Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 07:25:52. Contact: ###-####.
|
PLM02-02065
| Plumbing Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### nels
|
PLM02-01034
| Plumbing Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 08:04:42. Contact: ###-####. upc 905.3 need to pipe floor sink vent to 6 inches above flood level of water closets need to fix leak above 3 inch cross talked to plumber on job site 7/11/2002 4:02:15 PM
|
PLM02-02068
| Groundwork | 7/11/2002 | 7/11/2002 | 7/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 09:25:57. Contact: ###-####.
|