Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00141 FIR-Aging Inspection7/11/20037/11/20037/11/2003 12:00:00 AM PASS
work is in progress 7/11/2003 7:51:33 AM
BLD02-02459 FIRE-Final Inspection7/10/20037/11/20037/11/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 7/10/2003 at 8:27:34 AM. Contact: ###-####. need approved plans with notes to verify scope of work in corridors 7/11/2003 9:34:41 AM
BLD02-02768 FIRE-Final Inspection7/10/20037/11/20037/11/2003 12:00:00 AMAFAIL
###-#### sid curtain board not draft tight; it isn't installed north to south as shown on plans - installed west to east but still divides the space okay; will leave up to structural inspector if it is okay 7/11/2003 12:53:23 PM
BLD03-00940 FIRE-Final Inspection7/10/20037/11/20037/11/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/10/2003 at 7:28:55 PM. Contact: ###-####.
BLD02-02950 BLD-Final7/11/20037/11/20037/11/2003 12:00:00 AMAPASS
came up on aging. js
FIR03-00162 INSP-Final Inspection7/11/20037/11/20037/11/2003 12:00:00 AMPPASS
this was tested and completed when airport shell was completed; this is to close out the permit 7/11/2003 1:04:05 PM
BLD02-02950 FIRE-Final Inspection7/11/20037/11/20037/11/2003 12:00:00 AMPPASS
BLD03-01427 FIRE-Final Inspection7/11/20037/11/20037/11/2003 12:00:00 AMPFAIL
justin ###-#### manual flush bolts on main door; exit signs not working; need accessible door hardware on all doors per plans 7/11/2003 3:09:17 PM