PLM06-02210
| Final | 7/11/2006 | 7/11/2006 | 7/11/2006 4:42:52 PM | P | PASS |
|
|
|
PLM06-02196
| Final | 7/11/2006 | 7/11/2006 | 7/11/2006 4:42:41 PM | P | PASS |
|
|
|
PLM06-01277
| Sprinkler (Final) | 7/10/2006 | 7/11/2006 | 7/11/2006 3:47:31 PM | A | PART |
|
|
TIE IN OK JUST NEEDS TESTING
|
PLM06-02318
| Sprinkler (Final) | 7/11/2006 | 7/11/2006 | 7/11/2006 3:46:45 PM | P | PASS |
|
|
anthony ###-####
|
MEC06-02143
| Pressure Test | 7/11/2006 | 7/11/2006 | 7/11/2006 3:33:05 PM | P | PASS |
|
|
relocating meter.please do as early pm as possible; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
PLM06-02323
| Groundwork | 7/11/2006 | 7/11/2006 | 7/11/2006 2:55:56 PM | P | PASS |
|
|
gregg; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM05-04027
| Other | 7/11/2006 | 7/11/2006 | 7/11/2006 2:32:44 PM | P | FAIL |
|
|
REPLACE EXISTING ROOF DRAIN WITH NEW 8" PIPING GRADED TO THE POINT OF DISPOSAL PER UPC.
|