FIR06-00101
| INSP-Sprinkler Rough-in | 7/10/2006 | 7/11/2006 | 7/11/2006 4:00:37 PM | A | PART |
|
|
OH rough-in inspection at floors 3 and 4 only are okay for cover as discussed, one head is overspaced at guest room east side 4th floor, end of line heads at some locations exceed upward lift allowed and will require restraint, noted hanger overspacing at certain locations on 1" branch lines, heads at some locations will require adjustment to meet ceiling height, noted thermal expansion at grid system on the 3rd floor.
|
BLD06-01011
| FIRE-Final Inspection | 7/10/2006 | 7/11/2006 | 7/11/2006 10:45:17 AM | A | PASS |
|
|
Fire life safety passed field inspection.
|