FIR06-00338
| INSP-Sprinkler Rough-in | 7/10/2006 | 7/11/2006 | 7/11/2006 3:52:01 PM | P | PASS |
|
|
Sprinkler piping is ok to cover but there are corrections that need to be done. See approved plans for locations. This will be verified at final.
|
FIR06-00318
| INSP-Sprinkler Rough-in | 7/10/2006 | 7/11/2006 | 7/11/2006 3:50:40 PM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR02-00113
| INSP-Final Inspection | 7/11/2006 | 7/11/2006 | 7/11/2006 3:49:59 PM | P | PASS |
|
|
Upon visual inspection I found that the work had either been installed and later removed or never installed at all. The doors as shown on the plans do not exist.
|
BLD05-02671
| FIRE-Final Inspection | 7/10/2006 | 7/11/2006 | 7/11/2006 2:21:08 PM | P | FAIL |
|
|
Provide signage at the property entrance as discussed and provide the indicator at the lock on the main entrance/exit door.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 7/11/2006 | 7/11/2006 | 7/11/2006 1:47:06 PM | P | PASS |
|
|
The 8" city supply underground for the project is ok to cover. The two 8" elbows did not need to be installed.
|
BLD04-00917
| FIRE-Final Inspection | 7/10/2006 | 7/11/2006 | 7/11/2006 1:20:56 PM | A | PASS |
|
|
life safety finaled
|
BLD06-00756
| FIRE-Final Inspection | 7/10/2006 | 7/11/2006 | 7/11/2006 8:52:02 AM | A | PASS |
|
|
Life safety finaled
|