Inspections for the day of: Tuesday, July 11, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-03025 BLD-Framing/Rough-in7/10/20067/11/20067/11/2006 4:55:22 PMPPASS
Scheduled by a contractor via Hello! on 7/10/2006 at 4:16:04 PM. Contact: ###-####. insul. 2nd floor rooms, north wings.
BLD06-01828 BLD-Foundation7/11/20067/11/20067/11/2006 4:19:58 PMPPASS
ken - call prior so he can meet there - footing/foundation; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. monolithic placement. footing with slab on grade. verified vertical insul. to be placed on exterior side of stemwall.
BLD06-01174 BLD-Conference7/11/20067/11/20067/11/2006 3:46:03 PMPPASS
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Interior framning at aquarium.
BLD06-01937 BLD-Foundation7/10/20067/11/20067/11/2006 2:36:34 PMAPASS
john; Phone #: ###-#### - Note: early as possible - call 1/2 hr prior Internet Inspection Request from: Cathy Chiles
BLD05-02671 BLD-Final7/10/20067/11/20067/11/2006 2:19:53 PMPNR
Scheduled by a contractor via Hello! on 7/10/2006 at 8:09:06 PM. Contact: ###-####.needs code enforcement, public works and fire finals.
BLD06-00889 BLD-Other7/10/20067/11/20067/11/2006 2:14:38 PMAPASS
Scheduled by a contractor via Hello! on 7/10/2006 at 12:19:33 PM. Contact: ###-####. ceiling grid ok.
BLD06-01862 BLD-Footing7/10/20067/11/20067/11/2006 1:51:26 PMAPASS
russell; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD05-02089 BLD-Framing/Rough-in7/7/20067/11/20067/11/2006 1:36:46 PMAPASS
Phone #: ###-#### Internet Inspection Request from: Mike Walling. Interior framing.
BLD06-00533 BLD-Wall cover7/10/20067/11/20067/11/2006 1:09:36 PMANR
This request is for shear wall.; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN. Approved plan not on site.
BLD06-00569 BLD-Footing7/10/20067/11/20067/11/2006 1:01:05 PMADEFR
craig - pouring concrete between 7 and 8 am; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. conc. placed prior to 8:00am
BLD06-01265 BLD-Framing/Rough-in7/10/20067/11/20067/11/2006 1:00:25 PMAPASS
DEWAYNE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok to insul.
BLD05-00274 BLD-Framing/Rough-in7/10/20067/11/20067/11/2006 12:40:07 PMAPASS
darby - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. All framing issues have been resolved.
BLD05-00274 BLD-Energy code compliance7/11/20067/11/20067/11/2006 12:39:35 PMPPASS
darby - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD05-02426 BLD-Final7/10/20067/11/20067/11/2006 11:38:46 AMAPASS
MATT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Was finaled by Jim Sly, noted ok for perm occ.
BLD99-02217 BLD-Conference7/10/20067/11/20067/11/2006 11:36:46 AMADONE
wants to reopen the permit shawn will be home ###-####. Spoke with G. Slane about reopening permit. He noted that due to length of time, home owner would need to go to plan reveiw for new permit. home owner was notifed.