FIR07-00203
| INSP-Final Inspection | 7/10/2007 | 7/11/2007 | 7/11/2007 3:19:59 PM | A | PART |
|
|
Need curent resubmittals reflecting field modifications, remove plants blocking FDC and WPI, still need to complete trip testing, supervision and alarm tested okay.
|
FIR07-00208
| INSP-Final Inspection | 7/10/2007 | 7/11/2007 | 7/11/2007 3:17:25 PM | A | FAIL |
|
|
Still missing lock and paint at the breaker to the FACP, need to provide a horn only for the notification device in the office area, all other items tested satisfacory.
|
FIR07-00033
| INSP-Final Inspection | 7/11/2007 | 7/11/2007 | 7/11/2007 3:14:26 PM | P | PASS |
|
|
UG fire supply line permit finaled.
|
FIR07-00481
| INSP-Sprinkler Rough-in | 7/11/2007 | 7/11/2007 | 7/11/2007 3:11:19 PM | P | PART |
|
|
OH install is approved for cover, tenting completed okay.
|
FIR07-00127
| INSP-Final Inspection | 7/11/2007 | 7/11/2007 | 7/11/2007 12:22:12 PM | P | PART |
|
|
Duct detectors, notification devices and manual pull tested okay, final pending access control doors interconnection.
|
FIR07-00193
| INSP-Final Inspection | 7/10/2007 | 7/11/2007 | 7/11/2007 12:18:10 PM | A | FAIL |
|
|
Mixed response heads in the same fire area within the lab.
|
FIR07-00244
| INSP-Sprinkler Rough-in/Hydro | 7/10/2007 | 7/11/2007 | 7/11/2007 10:50:30 AM | A | FAIL |
|
|
Correction notice items are not completed as noted on the previous two inspections, still missing retaining straps at hangers, the added head outside the north common corridor is overspaced, copy room is not finished, noted field changes in the restrooms.
|