PLM08-01413
| Final | 7/11/2008 | 7/11/2008 | 7/11/2008 4:42:29 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/11/2008 at 9:24:06 AM. Contact: ###-####.
|
PLM08-00759
| Final | 7/11/2008 | 7/11/2008 | 7/11/2008 4:31:26 PM | P | PASS |
|
|
Reinspection after 12noon Phone #: ###-#### Internet Inspection Request from: Penny Smith
|
PLM08-01658
| Water and/or Sewer | 7/10/2008 | 7/11/2008 | 7/11/2008 4:00:22 PM | P | CANC |
|
|
hello Ready for ground work by 2pm Phone #: ###-#### Internet Inspection Request from: Brandon Rohricht
|
PLM07-03476
| Final | 7/11/2008 | 7/11/2008 | 7/11/2008 3:29:44 PM | P | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Gorham
|
PLM08-01647
| Water and/or Sewer | 7/10/2008 | 7/11/2008 | 7/11/2008 3:03:14 PM | P | PART |
|
|
Tim Phone #: ###-#### to install dcva for sprinkler.......ds
|
PLM08-01661
| Water and/or Sewer | 7/11/2008 | 7/11/2008 | 7/11/2008 2:44:30 PM | P | FAIL |
|
|
Don Phone #: ###-#### not bedded properly, back-graded and need to use proper transition glue at pvc-abs joint.....ds
|
PLM07-02178
| Plumbing Rough-in | 7/11/2008 | 7/11/2008 | 7/11/2008 2:11:44 PM | P | PART |
|
|
Mike Phone #: ###-#### 4th and 5th floors waste and vents tested...........ds
|
PLM08-01466
| Water and/or Sewer | 7/10/2008 | 7/11/2008 | 7/11/2008 1:28:40 PM | A | PART |
|
|
|
PLM07-03704
| Final | 7/10/2008 | 7/11/2008 | 7/11/2008 11:32:14 AM | A | FAIL |
|
|
lon Phone #: ###-#### fixtures not caulked and lav not set, t&p needs airgap, no water softner drain, no access for jetted tub, need floor mdrain in mechanical room exposed for pan drain.....ds
|
PLM08-00181
| Final | 7/10/2008 | 7/11/2008 | 7/11/2008 10:51:28 AM | A | CANC |
|
|
Please call Chad with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel Lavs need tempered water...........ds
|
PLM08-00180
| Final | 7/10/2008 | 7/11/2008 | 7/11/2008 10:50:43 AM | A | FAIL |
|
|
Please call Chad with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel need tempered water to lavs and D/F caulked....ds
|
PLM07-03323
| Plumbing Rough-in | 7/10/2008 | 7/11/2008 | 7/11/2008 9:29:46 AM | A | PASS |
|
|
On site contact is Rob @ ###-#### Phone #: ###-#### Internet Inspection Request from: Jane Amy finished with area A waste, vent and water.........ds
|
PLM08-00944
| Plumbing Rough-in | 7/10/2008 | 7/11/2008 | 7/11/2008 9:01:00 AM | A | PASS |
|
|
Rocky Phone #: ###-####
|
PLM08-01640
| Sprinkler (Final) | 7/10/2008 | 7/11/2008 | 7/11/2008 8:43:30 AM | A | PASS |
|
|
rich Phone #: ###-####
|