ESC08-00428
| Site Final | 7/11/2008 | 7/11/2008 | 7/11/2008 4:21:56 PM | P | PASS |
|
|
|
BLD08-01038
| BLD-Final | 7/11/2008 | 7/11/2008 | 7/11/2008 4:21:46 PM | P | PASS |
|
|
All issues resolved. ok for perm occ.
|
ESC08-00119
| Site Final | 7/11/2008 | 7/11/2008 | 7/11/2008 3:58:17 PM | P | PASS |
|
|
Bmps removed. final ok.
|
BLD08-00277
| BLD-Final | 7/10/2008 | 7/11/2008 | 7/11/2008 3:57:46 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/10/2008 at 12:41:41 PM. Contact: ###-####. Ok for temp occ...Needs to install tactile exit sighns at enterance/exits.
|
BLD08-01015
| BLD-Framing/Rough-in | 7/11/2008 | 7/11/2008 | 7/11/2008 3:11:08 PM | P | PART |
|
|
Ryan Phone #: ###-####. Neds to provide UL for 2hr fire barrier wall and provide UL datta for membrane and thru penetrations. Provide ceiling details from architect. Remove wood penetrations from 2hr. wall and repair. c/n posted. ok to cover except for 2hr. wall. no grid.
|
ESC08-00119
| Site Preparation | 7/11/2008 | 7/11/2008 | 7/11/2008 2:33:41 PM | P | CANC |
|
|
|
ESC08-00428
| Site Preparation | 7/11/2008 | 7/11/2008 | 7/11/2008 2:33:30 PM | P | CANC |
|
|
|
BLD08-01301
| BLD-Energy code compliance | 7/10/2008 | 7/11/2008 | 7/11/2008 2:26:50 PM | P | PASS |
|
|
troy- call 1 hr before Phone #: ###-####
|
BLD08-01301
| BLD-Framing/Rough-in | 7/10/2008 | 7/11/2008 | 7/11/2008 2:26:39 PM | P | PASS |
|
|
troy Phone #: ###-####
|
BLD08-01191
| BLD-Framing/Rough-in | 7/11/2008 | 7/11/2008 | 7/11/2008 1:56:18 PM | P | PART |
|
|
vic Phone #: ###-####. pend. mech ri on gas pipe.
|
BLD08-01038
| BLD-Final | 7/10/2008 | 7/11/2008 | 7/11/2008 11:02:12 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 7/10/2008 at 5:20:33 PM. Contact: ###-####.
|
BLD08-00707
| DOC - Permit Finaled | 7/11/2008 | 7/11/2008 | 7/11/2008 10:49:22 AM | P | PASS |
|
|
|
BLD08-00399
| BLD-Framing/Rough-in | 7/10/2008 | 7/11/2008 | 7/11/2008 10:27:14 AM | A | PART |
|
|
john Phone #: ###-####. Shear nailing on exterior walls ok. Also reveiwed special insp. reports on puddle wels and joist to base plate connections for gym roof. ok. Als noted rfi from engineer on conversions for staples.
|
BLD08-01051
| BLD-Other | 7/10/2008 | 7/11/2008 | 7/11/2008 7:14:48 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 7/10/2008 at 8:32:57 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 11 2008 7:14AM.
|