Inspections for the day of: Friday, July 11, 2008.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00428 Site Final7/11/20087/11/20087/11/2008 4:21:56 PMPPASS
BLD08-01038 BLD-Final7/11/20087/11/20087/11/2008 4:21:46 PMPPASS
All issues resolved. ok for perm occ.
ESC08-00119 Site Final7/11/20087/11/20087/11/2008 3:58:17 PMPPASS
Bmps removed. final ok.
BLD08-00277 BLD-Final7/10/20087/11/20087/11/2008 3:57:46 PMPPART
Scheduled by a contractor via Hello! on 7/10/2008 at 12:41:41 PM. Contact: ###-####. Ok for temp occ...Needs to install tactile exit sighns at enterance/exits.
BLD08-01015 BLD-Framing/Rough-in7/11/20087/11/20087/11/2008 3:11:08 PMPPART
Ryan Phone #: ###-####. Neds to provide UL for 2hr fire barrier wall and provide UL datta for membrane and thru penetrations. Provide ceiling details from architect. Remove wood penetrations from 2hr. wall and repair. c/n posted. ok to cover except for 2hr. wall. no grid.
ESC08-00119 Site Preparation7/11/20087/11/20087/11/2008 2:33:41 PMPCANC
ESC08-00428 Site Preparation7/11/20087/11/20087/11/2008 2:33:30 PMPCANC
BLD08-01301 BLD-Energy code compliance7/10/20087/11/20087/11/2008 2:26:50 PMPPASS
troy- call 1 hr before Phone #: ###-####
BLD08-01301 BLD-Framing/Rough-in7/10/20087/11/20087/11/2008 2:26:39 PMPPASS
troy Phone #: ###-####
BLD08-01191 BLD-Framing/Rough-in7/11/20087/11/20087/11/2008 1:56:18 PMPPART
vic Phone #: ###-####. pend. mech ri on gas pipe.
BLD08-01038 BLD-Final7/10/20087/11/20087/11/2008 11:02:12 AMANR
Scheduled by a contractor via Hello! on 7/10/2008 at 5:20:33 PM. Contact: ###-####.
BLD08-00707 DOC - Permit Finaled7/11/20087/11/20087/11/2008 10:49:22 AMPPASS
BLD08-00399 BLD-Framing/Rough-in7/10/20087/11/20087/11/2008 10:27:14 AMAPART
john Phone #: ###-####. Shear nailing on exterior walls ok. Also reveiwed special insp. reports on puddle wels and joist to base plate connections for gym roof. ok. Als noted rfi from engineer on conversions for staples.
BLD08-01051 BLD-Other7/10/20087/11/20087/11/2008 7:14:48 AMACANC
Scheduled by a contractor via Hello! on 7/10/2008 at 8:32:57 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 11 2008 7:14AM.