Inspections for the day of: Monday, July 11, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00547 General Inspection7/11/20117/11/20117/11/2011 1:24:14 PM PASS
ESC10-00576 General Inspection7/11/20117/11/20117/11/2011 11:48:34 AM DONE
Permit finaled.
ESC10-00576 DOC - Permit Finaled7/11/20117/11/20117/11/2011 11:48:13 AMPPASS
ESC11-00246 General Inspection7/11/20117/11/20117/11/2011 10:52:40 AM PASS
ESC11-00351 Site Preparation7/11/20117/11/20117/11/2011 9:30:04 AM PASS
ESC05-01012 Aging Inspection7/11/20117/11/20117/11/2011 8:58:16 AM DONE
Permit DOC Expired.
ESC05-01012 DOC - Permit Expired7/11/20117/11/20117/11/2011 8:57:56 AMPPASS
ESC11-00395 Site Preparation7/11/20117/11/20117/11/2011 8:39:25 AM PASS
ESC11-00396 Site Preparation7/11/20117/11/20117/11/2011 8:39:15 AM PASS
ESC11-00267 Site Preparation7/7/20117/11/20117/11/2011 8:29:21 AMANR
Waiting on a permit from ACHD for flagging to occur.
ESC11-00048 General Inspection7/11/20117/11/20117/11/2011 8:28:23 AM FAIL
Verbal to RP and Developer (Jeff Snyder):
Clean up all stucco wash out and piles. Provide a washout pit through the duration of the project, until the time when no non storm water pollutants need to be washed out. Will re-inspect on 7/13/2011AM.