|
Fire alarm work tested today includes sprinkler monitoring-pump, riser, floor control manifolds-, elevator recall functions at car #1, machine rooms for elevators 1, 2 and 3, occupant notification throughout core areas basement to 7th floor, nac and FACP batteries, SD's at the freight elevator, MP, SD at nac's, ID's at the 2nd floor, DD for RTU 3, lobby door mags, offiste monitoring. Need to provide plan modification for added ID's and to include field changes in system layout such as relocated FACP, HD at hoistways, added lobby SD, PIV, relay for lobby mag locks, etc. Post points map. Some items corrected while on site including descriptor at west 1st floor waterflow, added HD at machine room 2/3, nac B battery trouble, deck secured SD, tamper 1st floor east. Need to remove HD at elevator hoistway #1, repair door hold at the basement level.
|