ESC14-00193
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 4:02:12 PM | | PASS |
|
|
No activity on this phase of Old Boise streetscapes yet.
|
ESC14-00644
| Site Preparation | 7/11/2014 | 7/11/2014 | 7/11/2014 3:21:10 PM | P | PASS |
|
|
Clark Phone #: ###-####
Met Clark onsite for site prep. Has wattles on site to laydown at end of each day when work is done so wattle won't get damaged by foot and vehicl. No MS4 in area. Flat parcel. Permit posted. Housekeeping will be main BMP.
|
ESC12-00849
| DOC - Permit Finaled | 7/11/2014 | 7/11/2014 | 7/11/2014 2:50:00 PM | P | PASS |
|
|
Construction activity is complete. Homeowner to finish landscaping. No ESC issues, conditions satisfied.
|
ESC14-00450
| Site Preparation | 7/11/2014 | 7/11/2014 | 7/11/2014 2:36:24 PM | P | PASS |
|
|
Call me 30 minutes before you arrive. There is no access to the site without an escort. Eldon Oyadomari, Idaho Power Phone #: ###-#### >> Inspection requested via web by Eldon Oyadomari
Construction is within gravel utilitiy yard. No surface water, no drainage structures in area of work or on Amity. Low risk. Idaho Power will schedule a Site Final when project is complete. Approved for construction.
|
ESC13-01263
| Random Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 2:14:10 PM | P | PASS |
|
|
BK tennis court and parking project is still underway. Parking lot is now paved and tennis court foundation is laid but no top surface yet. The berm that was tacified is holding together well and no dust issues.
No corrections at this time.
|
ESC14-00036
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 1:59:54 PM | | PASS |
|
|
WIP on BK east wing addition. Swale across access lane from project area has wattle protection. Parking lot DI's have filter bags. Mostly interior work remains as well as exterior landscaping/stabilization. Currently in compliance.
|
ESC13-00946
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 1:32:17 PM | | PASS |
|
|
WIP. McNealy Eye Clinic's frame is up. Project is on a pad with existing parking lot and stormwater drainarge. No trackout; trash kept in large container. No corrections at this time.
|
ESC14-00212
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 12:33:33 PM | P | PASS |
|
|
Work has begun on footings and foundations. McAlvain has set up sediment filtration tank for groundwater dewatering. Regular pH and turbidity samples are being taken.
No trackout. BMPs installed. Permit posted and RP Jose is always on site keeping site in compliance.
|
ESC14-00211
| Random Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 12:28:57 PM | P | PASS |
|
|
Finaled. See ESC14-00212 for Lusk Place ESC inspections.
|
ESC14-00211
| DOC - Permit Finaled | 7/11/2014 | 7/11/2014 | 7/11/2014 12:26:19 PM | P | PASS |
|
|
Rough grading and grubbing for Lusk Place apartments is complete. The foundations and footings are now covered under ESC14-00212. RP is Jose Bautista for that project as well. See other permit for continued inspection activity.
|
ESC12-00130
| Site Preparation | 7/11/2014 | 7/11/2014 | 7/11/2014 12:21:01 PM | P | PASS |
|
|
Mike Wilson - McAlvain project manager # ###-####.
BMPs include silt fence with posts close together for extra posts lining the Greenbelt to the north of project. Wattles installed on west and east side. All DIs downstream towards Ann Morrison have filter protection. Permit and SWPPP on-site,
Test pit found ground water 5 ft below the footing elevation last week, so currently they are not anticipating dewatering
|
ESC14-00239
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 11:33:11 AM | | PASS |
|
|
WIP on footings and foundation. All surrounding DIs are protected, two construction entrances, and large lined washout onsite and being utilized. No corrections required.
|
ESC14-00463
| DOC - Permit Finaled | 7/11/2014 | 7/11/2014 | 7/11/2014 11:32:05 AM | P | PASS |
|
|
Demolition phase of old bus terminal is complete for Sherwood Apartments. No work has begun on footing and foundation. See ESC14-00239 for inspection activities for project.
|
ESC14-00370
| Site Preparation | 7/10/2014 | 7/11/2014 | 7/11/2014 11:13:52 AM | A | PASS |
|
|
Grant Kolnes Phone #: ###-####
Spoke with RP/GC on phone regarding ESC conditions. Permit posted, lined washout installed. Lot is below grade of street, no surface water, and no MS4 infrastructure on Chester. Low risk. Approved. Construction to begin Monday.
|
ESC14-00608
| Random Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 11:03:36 AM | P | FAIL |
|
|
Observed excessive dust from rough grading project. The grass/hay has been scraped so now there is loose dirt.
No water truck on site - may be refilling but no evidence of dust suppression.
Verbal correction request to provide dust control at site discussed with Jeff from Knife River. He stated he will ensure that water truck is on site ASAP.
|
ESC13-00969
| Aging Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:53:45 AM | | PASS |
|
|
WIP. Starting on frame. Keeping sidewalk and road free of sediment and construction materials. No corrections.
|
ESC13-01046
| Aging Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:52:52 AM | | PASS |
|
|
Foundation poured. No vertical construction yet. No violations.
|
ESC13-00963
| Aging Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:52:07 AM | | PASS |
|
|
WIP. No violations.
|
ESC13-00999
| Aging Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:51:31 AM | | PASS |
|
|
Foundation already poured. No vertical work yet. Permit posted.
|
ESC13-01028
| Aging Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:44:05 AM | | PASS |
|
|
No activity yet. Lot owned by Tahoe and has stockpile on it from adajacent projects. No sediment leaving site.
|
ESC13-01279
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:36:52 AM | | PASS |
|
|
No activity at time of inspection. No trackout to Eckart, permit posted, silt fence perimeter in good condition. Fill and grading is complete, remaining stockpile has vegetated. No dust observed.
|
ESC13-00793
| Random Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:28:46 AM | P | PASS |
|
|
Terraces laydown yard silt fence and fence perimeter is in good condition. The fence has trapped some lumber plastic wraps that will need to be cleaned when project is complete. No dust or trackout issues observed.
|
ESC13-00070
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:19:00 AM | | PASS |
|
|
Terraces condos are within the main project. The construction entrance on Council Springs is in good condition and is designated for entrance only to prevent trackout. Silt fence perimeter behind condos is in good condition. Approved.
|
ESC13-00071
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:18:41 AM | | PASS |
|
|
Terraces condos are within the main project. The construction entrance on Council Springs is in good condition and is designated for entrance only to prevent trackout. Silt fence perimeter behind condos is in good condition. Approved.
|
ESC13-00072
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:18:23 AM | | PASS |
|
|
Terraces condos are within the main project. The construction entrance on Council Springs is in good condition and is designated for entrance only to prevent trackout. Silt fence perimeter behind condos is in good condition. Approved.
|
ESC11-00525
| Random Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 10:12:57 AM | P | PASS |
|
|
Mill District Square sub is still in progress. Open areas are permited for landscaping and stockpiling needs. DI bags installed and have been recently maintained, washout is lined and has over 70% capacity remaining, streets are clean, permit posted with SWPPP book.
No correctons required.
|
ESC14-00241
| General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 8:41:59 AM | | PASS |
|
|
WIP. Permit posted. Parking lot DIs have protection. No trackout to Century Way. No corrections required.
|