FIR16-00404
| INSP-Sprinkler Rough-in | 7/11/2016 | 7/11/2016 | 7/11/2016 3:43:22 PM | P | PASS |
|
|
rough in passed and piping can be covered
|
NAF16-00050
| INSP-Final | 7/11/2016 | 7/11/2016 | 7/11/2016 3:42:35 PM | P | FAIL |
|
|
Inspection was for a rough to cover. Piping is ok to cover and can be finaled when the ceiling tile has been installed
|
BLD16-01217
| FIRE-Alarm Testing | 7/11/2016 | 7/11/2016 | 7/11/2016 11:58:54 AM | P | CANC |
|
|
Please call Phil Allen when on site @ ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD16-01217
| FIRE-Final Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 11:23:07 AM | P | PART |
|
|
The new StarBucks Kiosk is ok to occupy. No other work inspected.
|