FIR16-00204
| INSP-Sprinkler Rough-in/Hydro | 7/11/2016 | 7/11/2016 | 7/11/2016 4:47:27 PM | P | PART |
|
|
Hydrostatic test complete for overhead fire sprinkler piping on levels 2, 3, 5, and 6. Hydrostatic test for other levels to be completed at later date. Flow switch/tamper switches tested for levels 1 thru 9 on stairwell wet pipe valves, all tested satisfactorily.
|
FIR16-00008
| INSP-Sprinkler Rough-in/Hydro | 7/11/2016 | 7/11/2016 | 7/11/2016 3:05:06 PM | P | CANC |
|
|
Hydrostatic test was completed for level 1 and 2 of the annex building, wrong FIR permit number for hydrostatic test request, this permit is for 2nd level of headquarters building not the annex.. Correct FIR permit number will need to be requested to have hydrostatic test completed.
|
FIR16-00314
| INSP-Sprinkler Rough-in | 7/11/2016 | 7/11/2016 | 7/11/2016 3:00:49 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 3 complete, level 3 overhead fire sprinkler piping approved for cover.
|
BLD16-01501
| FIRE-Final Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 2:50:09 PM | P | CANC |
|
|
Inspection request cancelled per conversation with Zack
|
FIR16-00275
| INSP-Sprinkler Rough-in/Hydro | 7/11/2016 | 7/11/2016 | 7/11/2016 1:15:47 PM | P | PASS |
|
|
Hydrostatic test complete for level 6
|
FIR16-00081
| INSP-Final Inspection | 7/8/2016 | 7/11/2016 | 7/11/2016 9:43:31 AM | A | PASS |
|
|
Previously noted items addressed/repaired, final fire sprinkler inspection passed/complete.
|
BLD16-01272
| FIRE-Final Inspection | 7/8/2016 | 7/11/2016 | 7/11/2016 8:24:55 AM | A | PASS |
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection passed/complete.
|