NAF17-00020
| INSP-Sprinkler Rough-in/Hydro | 7/11/2017 | 7/11/2017 | 7/11/2017 2:01:33 PM | P | CANC |
|
|
Contact is Scott Powada ###-#### he would like to do the Hydro and then the flush 2 hrs later if possible, please let him know if this can be done.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
BLD17-01383
| FIRE-Final Inspection | 7/11/2017 | 7/11/2017 | 7/11/2017 1:16:46 PM | P | PASS |
|
|
life safety passed
|
FIR17-00329
| INSP-Sprinkler Rough-in/Hydro | 7/11/2017 | 7/11/2017 | 7/11/2017 11:33:06 AM | P | PASS |
|
|
Underground hydro test passed
|
FIR17-00345
| INSP-Sprinkler Rough-in | 7/10/2017 | 7/11/2017 | 7/11/2017 11:03:08 AM | A | PASS |
|
|
Piping ok to cover
|
BLD16-01848
| FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 9:00:44 AM | A | PASS |
|
|
life safety passed
|
BLD16-01847
| FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 9:00:12 AM | A | PASS |
|
|
life safety passed
|
BLD16-01850
| FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 8:58:48 AM | A | PASS |
|
|
life safety passed
|
BLD16-01849
| FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 8:58:19 AM | A | PASS |
|
|
life safety passed
|