BLD16-03440
| FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 2:48:26 PM | P | PART |
|
|
Power transfer from normal power source to emergency power for egress lighting complete in TCO requested area (Northwest Basement level, level 1 and level 2 mechanical)
|
BLD17-01333
| FIRE-Final Inspection | 7/7/2017 | 7/11/2017 | 7/11/2017 1:07:17 PM | P | CANC |
|
|
Called point of contact two time at Ext.1008- Mary Phone #: ###-####, a message was left both times, this inspection request is cancelled and a new inspection request will need to be made for a later date.
|
FIR17-00208
| INSP-Supply line flush | 7/10/2017 | 7/11/2017 | 7/11/2017 10:01:53 AM | A | DONE |
|
|
Underground main line flush complete
|
FIR17-00208
| INSP-Sprinkler Rough-in/Hydro | 7/10/2017 | 7/11/2017 | 7/11/2017 10:01:24 AM | A | PASS |
|
|
Underground hydrostatic test complete
|
BLD14-03434
| FIRE-Final Inspection | 7/11/2017 | 7/11/2017 | 7/11/2017 8:35:35 AM | P | PASS |
|
|
Fire sprinkler inspections are complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIR17-00312
| INSP-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 8:30:16 AM | A | PASS |
|
|
Final fire sprinkler inspection for area of work passed/complete.
|
FIR17-00312
| INSP-Sprinkler Rough-in | 7/11/2017 | 7/11/2017 | 7/11/2017 8:29:43 AM | A | PASS |
|
|
Rough to cover inspection complete for overhead fire sprinkler piping, approved for cover.
|