ELE18-02593
| Final | 7/11/2018 | 7/11/2018 | 7/11/2018 2:22:00 PM | P | PASS |
|
|
Weather head replacement Phone #: ###-#### Inspection requested via web by Kendra Lanham Final ok
|
ELE18-02593
| Permanent Service | 7/11/2018 | 7/11/2018 | 7/11/2018 1:12:19 PM | P | PASS |
|
|
Weather head replacement Phone #: ###-#### Inspection requested via web by Kendra Lanham Repair of mast only. p/s o/h rec ok
|
ELE18-02011
| Electrical Rough-In | 7/10/2018 | 7/11/2018 | 7/11/2018 1:11:17 PM | P | PASS |
|
|
Final Inspection for Suite 424 only. Please call Lynn prior to arrival. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor 424 only grid and TCO ok
|
ELE18-02126
| Final | 7/11/2018 | 7/11/2018 | 7/11/2018 12:36:00 PM | P | FAIL |
|
|
Idaho Power is scheduled to connect power to the pedestal today. we are requesting a final inspection for this project. Our contact is Larry, ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Larry Looney 408.4- Circuit directory shall be complete and accurate. 1 20 amp breaker buried behind knock out and feeds photo cell.
|
ELE18-02585
| Final | 7/10/2018 | 7/11/2018 | 7/11/2018 11:23:13 AM | A | PASS |
|
|
Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Bathrooms on floors 2, 3, 10, 12 new luminaires. Final ok
|
ELE18-02585
| Final | 7/11/2018 | 7/11/2018 | 7/11/2018 10:59:10 AM | P | PASS |
|
|
Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Repace luminaires in bathrooms on floors 2, 3, 10, 12 rough in ok cover
|
ELE18-02584
| Electrical Rough-In | 7/10/2018 | 7/11/2018 | 7/11/2018 10:57:19 AM | A | PASS |
|
|
Wall rough in inspection on level 4 Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Make sure to sign sign in sheet for security Wall rough in ok cover
|
ELE17-04065
| Final | 7/10/2018 | 7/11/2018 | 7/11/2018 9:55:27 AM | A | FAIL |
|
|
Looking for a TCO. Please come as early as possible. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen 110.3- Outdoor receptacles not working. 110.3- Level 2 (Kim D office) receptacle outlets not working. 110.3- Baseboard manufacurers instructions state receptacle outlets shall not be installed over baseboard heaters. 110.26- Level 2 (Kim D office) Minimum work space shall be provided for panel K2-P1. Built in desk installed in front of panel. 210.70(A)(2)- Each door with access to exterior shall have a luminaire installed for egress. 300.15- All wiring shall terminate in a box. Patio light wires. 314.25- All boxes shall have covers. Light box over stair and wire for light over door. BCC 4 05 17- Unlawful electrical procedures. All work to be performed by a licensed electrical contractor. It has been reported some receptacles were changed by an unlicensed person.
|
ELE18-02572
| Temporary Service | 7/10/2018 | 7/11/2018 | 7/11/2018 8:35:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson t/s o/h n ok
|