Inspections for the day of: Wednesday, July 11, 2018.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-02593 Final7/11/20187/11/20187/11/2018 2:22:00 PMPPASS
Weather head replacement Phone #: ###-#### Inspection requested via web by Kendra Lanham Final ok
ELE18-02593 Permanent Service7/11/20187/11/20187/11/2018 1:12:19 PMPPASS
Weather head replacement Phone #: ###-#### Inspection requested via web by Kendra Lanham
Repair of mast only. p/s o/h rec ok
ELE18-02011 Electrical Rough-In7/10/20187/11/20187/11/2018 1:11:17 PMPPASS
Final Inspection for Suite 424 only. Please call Lynn prior to arrival. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor
424 only grid and TCO ok
ELE18-02126 Final7/11/20187/11/20187/11/2018 12:36:00 PMPFAIL
Idaho Power is scheduled to connect power to the pedestal today.
we are requesting a final inspection for this project. Our contact is Larry,
###-####. Thank you! Phone #: ###-#### Inspection requested via web by Larry Looney
408.4- Circuit directory shall be complete and accurate. 1 20 amp breaker buried behind knock out and feeds photo cell.
ELE18-02585 Final7/10/20187/11/20187/11/2018 11:23:13 AMAPASS
Contact Jon Novak
Thank you Phone #: ###-#### Inspection requested via web by Tom Betty
Bathrooms on floors 2, 3, 10, 12 new luminaires. Final ok
ELE18-02585 Final7/11/20187/11/20187/11/2018 10:59:10 AMPPASS
Contact Jon Novak
Thank you Phone #: ###-#### Inspection requested via web by Tom Betty
Repace luminaires in bathrooms on floors 2, 3, 10, 12 rough in ok cover
ELE18-02584 Electrical Rough-In7/10/20187/11/20187/11/2018 10:57:19 AMAPASS
Wall rough in inspection on level 4
Contact Jon Novak
Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Make sure to sign sign in sheet for security Wall rough in ok cover
ELE17-04065 Final7/10/20187/11/20187/11/2018 9:55:27 AMAFAIL
Looking for a TCO. Please come as early as possible. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen
110.3- Outdoor receptacles not working.
110.3- Level 2 (Kim D office) receptacle outlets not working.
110.3- Baseboard manufacurers instructions state receptacle outlets shall not be installed over baseboard heaters.
110.26- Level 2 (Kim D office) Minimum work space shall be provided for panel K2-P1. Built in desk installed in front of panel.
210.70(A)(2)- Each door with access to exterior shall have a luminaire installed for egress.
300.15- All wiring shall terminate in a box. Patio light wires.
314.25- All boxes shall have covers. Light box over stair and wire for light over door.
BCC 4 05 17- Unlawful electrical procedures. All work to be performed by a licensed electrical contractor. It has been reported some receptacles were changed by an unlicensed person.
ELE18-02572 Temporary Service7/10/20187/11/20187/11/2018 8:35:39 AMAPASS
Phone #: ###-#### Inspection requested via web by Ryan Wilson
t/s o/h n ok