Inspections for the day of: Wednesday, July 11, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-01736 Final7/10/20187/11/20187/11/2018 1:41:03 PMPPASS
If you have any questions please call Fred at ###-####. Thank You. Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. Lockout needed for DW. Electrician had lockout available.
ELE18-02104 Electrical Rough-In7/10/20187/11/20187/11/2018 1:21:53 PMPPASS
Inspection requested via web by Scott Larson Ok cover entry.
ELE18-02603 Temporary Service7/11/20187/11/20187/11/2018 12:46:05 PMPPASS
garage code 1001e Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
ELE18-01307 Final7/11/20187/11/20187/11/2018 12:21:18 PMPPASS
Swimming pool final. Access granted through gate on right side of residence. Phone #: ###-#### Inspection requested via web by Lars Johnson Ok final.
ELE18-02404 Permanent Service7/11/20187/11/20187/11/2018 12:06:25 PMPPASS
new service will be ready about same as yesterday Phone #: ###-#### Inspection requested via web by dennis mcneely p/s o/h rec ok
ELE18-02589 Rough-In Permanent Service7/11/20187/11/20187/11/2018 10:59:44 AMAPASS
Phone #: ###-#### Inspection requested via web by Kevin Heideman p/s u/g n ok
ELE18-01952 Permanent Service7/11/20187/11/20187/11/2018 10:47:46 AMAPASS
Phone #: ###-#### Inspection requested via web by PAUL PINNEY New service required due to easement from property next door. Service and 200a disconnect mounted on Class 6 pole to rear of property. Grds and neut seperated at all in one on detached garage. p/s o/h n ok
ELE18-02590 Permanent Service7/11/20187/11/20187/11/2018 10:09:28 AMAPASS
We Are Ready For Permanent Service This Is A Manufactured Home And Is Ready, The Factory Service Is A Little High But We Will Address It Before Final! Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett 2 grd rods. p/s o/h n ok
ELE18-02379 Electrical Rough-In7/10/20187/11/20187/11/2018 9:57:47 AMAPASS
Potting ; Bonding Inspection any questions Please Call Louis @ ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Ok cover. Perimeter per code, potting ok.
ELE18-02583 Electrical Rough-In7/10/20187/11/20187/11/2018 9:33:35 AMAPASS
Need an ok to cover in the kitchen and bath areas. Call Jimmy for questions at ###-####. Later in the morning preffered if possible. Phone #: ###-#### Inspection requested via web by John Edwards Ok cover kitch and bath.
ELE18-01848 Final7/10/20187/11/20187/11/2018 9:33:06 AMAPASS
Key is in mailbox Phone #: ###-#### Inspection requested via web by George Pascua Ok final.
ELE18-01329 Rough-In Permanent Service7/10/20187/11/20187/11/2018 9:00:13 AMAPASS
Phone #: ###-#### Inspection requested via web by Darryn Coburn Service mounted on concrete wall to left of driveway. p/s u/g n ok