Inspections for the day of: Wednesday, July 11, 2018.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-00392 FIRE-Final Inspection7/10/20187/11/20187/12/2018 8:23:28 AMAFAIL
Provide single action hardware that is interconnected with the deadbolts or remove the deadbolts. Provide fire extinguishers as discusssed.

Chris Phone #: ###-####
FIR18-00524 INSP-Sprinkler Rough-in7/11/20187/11/20187/11/2018 1:53:00 PMPPASS
Rough-in passed. Piping can be covered. I noted that one piece of pipe labeled to be 1 1/2" in size has been installed as 1". This will need approval and changed/re-inspected if not approved.

Phone #: ###-#### Inspection requested via web by Connie Danes
FIR15-00822 INSP-Sprinkler Rough-in7/10/20187/11/20187/11/2018 1:50:50 PMPPASS
Most corrections have been made and are marked "ok" on the plans. Still need earthquaking at the 6" existing riser and at the risers in the fire pump room.

Phone #: ###-#### Inspection requested via web by Stan Beus
NAF18-00006 INSP-Sprinkler Rough-in/Hydro7/10/20187/11/20187/11/2018 1:49:25 PMPPASS
The overhead hydro tests of the first and second floors passed. Rough-in passed for the first and second floors and piping can be covered.


RICK FRY IS OUR CONTACT PERSON. Phone #: ###-#### Inspection requested via web by Brad Bettencourt
FIR18-00411 INSP-Sprinkler Rough-in7/10/20187/11/20187/11/2018 10:47:39 AMAPASS
Sprinkler pendant spacing off from the drop ceilings/soffits in the rooms was verified in the first ans second floor apartments in the south half of the building.

Soffits Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-02363 FIRE-Final Inspection7/10/20187/11/20187/11/2018 10:43:33 AMAFAIL
Provide sticker at main exit, mount the fire extinguisher, remove thumbturn at rear exit

after 10 am please call when on way to meet you // Khadija Phone #: ###-####
NAF18-00048 INSP-Sprinkler Rough-in/Hydro7/10/20187/11/20187/11/2018 9:12:17 AMAFAIL
underground hydro

Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR17-00596 INSP-Sprinkler Rough-in7/10/20187/11/20187/11/2018 7:56:17 AMAPASS
See the city approved plans for additional areas that are approved for cover.

Contact Hunter Anderson - ###-#### 30 min prior to RTC insp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank