Inspections for the day of: Monday, July 12, 1999.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD97-03429 INSP - Final7/9/19997/12/19997/12/2003 12:00:00 AMPCANC
07/12/99 407 - need drainage before final.
MEC99-00612 INSP - Framing/ Rough-in7/9/19997/12/19997/12/1999 12:00:00 AMAPART
07/12/99 407 - gas test failed.
BLD99-00907 INSP - Framing/Rough-in7/12/19997/12/19997/12/1999 12:00:00 AMAPASS
recieved letter from truss co.approved all truss items on correction.no can complete all extand heetrocking.
BLD99-01543 INSP - Wall cover7/12/19997/12/19997/12/1999 12:00:00 AMAFAIL
07/12/99 407 - need approved plans.
BLD99-01543 INSP - Wall cover7/12/19997/12/19997/12/1999 12:00:00 AMPPASS
/ / 407 - OK TO SIDE.
BLD99-01698 INSP - Wall cover7/12/19997/12/19997/12/1999 12:00:00 AMPPASS
07/12/99 407 - per russ wall cover
BLD99-01908 INSP - Final7/12/19997/12/19997/12/1999 12:00:00 AMPPASS
/ / 407 - OK.
BLD99-01220 INSP - Framing/Rough-in7/9/19997/12/19997/12/1999 12:00:00 AMPFAIL
07/12/99 407 - nail and mst strap as per plans.
BLD99-01541 INSP - Framing/Rough-in7/12/19997/12/19997/12/1999 12:00:00 AMPPART
07/12/99 407 - has to ad florr 2 floor stap,nailing ok.
MEC99-01401 INSP - Final7/12/19997/12/19997/12/1999 12:00:00 AMPPASS
07/12/99 407 - ###-#### sabrina
MEC99-01401 INSP - Final7/12/19997/12/19997/12/1999 12:00:00 AMPPASS
07/12/99 407 - ###-#### sabrina
BLD98-03044 INSP - Final7/12/19997/12/19997/12/1999 12:00:00 AMPFAIL
07/12/99 407 - not ready.
BLD99-00545 INSP - Energy code compliance7/9/19997/12/19997/12/1999 12:00:00 AMPNR
07/12/99 407 - TIM ###-####
BLD99-00545 INSP - Framing/Rough-in7/9/19997/12/19997/12/1999 12:00:00 AMPPASS
07/12/99 407 - TIM ###-####
BLD99-00795 INSP - Foundation7/12/19997/12/19997/12/1999 12:00:00 AMPPASS
07/12/99 407 - walls ok, hold downs are being placed now.