Inspections for the day of: Wednesday, July 12, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01684 BLD-Footing7/11/20007/12/20007/12/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/11/2000 at 13:26:40. Contact: . Appears ok 7/13/00 11:30:52 AM
BLD00-00967 BLD-Framing/Rough-in7/11/20007/12/20007/12/2000 12:00:00 AMAPASS
shear wall/nailing ###-#### Shear nail ok 7/13/00 11:30:47 AM
BLD00-01868 BLD-Final7/11/20007/12/20007/12/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/11/2000 at 16:16:28. Contact: ###-####. Appears ok/some material left at entrance for A barrade. 7/13/00 11:30:40 AM
BLD00-01360 BLD-Framing/Rough-in7/12/20007/12/20007/12/2000 12:00:00 AMPPASS
emmett--###-#### shear wall insp Shear ok 7/13/00 1:33:59 PM
BLD00-01552 BLD-Footing7/12/20007/12/20007/12/2000 12:00:00 AMPFAIL
clyde ###-#### ft Depth not to plan 7/13/00 1:34:07 PM
BLD99-03405 BLD-Framing/Rough-in7/12/20007/12/20007/12/2000 12:00:00 AMPFAIL
###-#### C/N previous not done. 7/13/00 11:29:36 AM
BLD00-01550 BLD-Foundation7/12/20007/12/20007/12/2000 12:00:00 AMPPART
shawn ###-#### Appears ok work in progress 7/13/00 11:30:03 AM
BLD00-01630 BLD-Footing7/12/20007/12/20007/12/2000 12:00:00 AMPFAIL
late pm ###-#### Not ready- need soil report/engineering. 7/13/00 11:30:21 AM
BLD00-00444 BLD-Framing/Rough-in7/11/20007/12/20007/12/2000 12:00:00 AMPPART
###-#### Ok on ext. shear wall w/work in progress. 7/13/00 11:29:53 AM
BLD00-01287 BLD-Framing/Rough-in7/11/20007/12/20007/12/2000 12:00:00 AMPFAIL
brian--###-#### fr C/N left/trusses- energy code 7/13/00 1:33:52 PM
BLD99-03720 BLD-Framing/Rough-in7/11/20007/12/20007/12/2000 12:00:00 AMPFAIL
Jerry ###-#### Elec. not signed off- front entry area 7/13/00 11:29:27 AM