PLM01-00291
| Final | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PASS |
|
|
###-#### back door by big tub open
|
PLM01-02208
| Groundwork | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 04:15:25. Contact: ###-####.
|
PLM01-02291
| Sprinkler (Final) | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 334 On 7/12/2001 1:10:43 PM
|
PLM01-02208
| Plumbing Rough-in | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 04:16:14. Contact: ###-####.
|
PLM01-02301
| Final | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PASS |
|
|
###-#### water line
|
PLM01-02291
| Sprinkler (Final) | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PART |
|
|
PAT- ###-####
|