BLD01-00645
| BLD-Footing | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 10:00:41. Contact: ###-####...bar in place; ok pend spec insp report; Strata onsite. 7/12/2001 11:10:42 AM
|
BLD01-00641
| BLD-Footing | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 10:01:48. Contact: ###-####. garages...looks ok; pend spec insp report (Strata onsite) 7/12/2001 11:09:53 AM
|
BLD01-01090
| BLD-Footing | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
Gile ###-#### exit ret wall ok...remove water from forms 7/12/2001 10:27:26 AM
|
BLD01-00183
| BLD-Framing/Rough-in | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
###-#### ok to side & cover ; chk glass & fan at final (bath)7/12/2001 10:22:23 AM 7/12/2001 10:25:38 AM
|
BLD01-01604
| BLD-Framing/Rough-in | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 17:30:34. Contact: ###-####. c/n, hd's, nailing, 7/12/2001 9:37:47 AM
|
BLD01-01089
| BLD-Framing/Rough-in | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 7/12/2001 10:48:08 AM ok to cover; keep c/n letter to follow
|
BLD01-01090
| BLD-Framing/Rough-in | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 7/12/2001 10:45:34 AM keep c/n; arch's letter to follow...ok to cover
|
BLD01-00525
| BLD-Conference | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 7/12/2001 11:40:41 AM w/ bldr...need fire & elec for t/o; verified 3hr doors at bsmt elev shaft entry
|
BLD00-02242
| BLD-Conference | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 7/12/2001 12:00:46 PM need other finals & arch's letter requesting deletion of work not to be completed for "shell";
|
BLD01-00491
| BLD-Conference | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 7/12/2001 8:37:19 AM w/ bldr re c/n of 7-11.
|
BLD00-03543
| BLD-Final | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | FAIL |
|
|
###-####...need fire ok; racks have 6"flue space" and attachment to floor as shown. ok for t/o pending fire/safety ok 7/12/2001 4:27:30 PM
|
BLD01-01709
| BLD-Foundation | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PART |
|
|
###-#### walls ok 7/12/2001 3:36:53 PM
|
BLD01-00176
| BLD-Conference | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 7/12/2001 4:57:53 PM w/ George DuPont w/ MTI re spec insp...scope of work?
|
BLD01-00673
| BLD-Framing/Rough-in | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 08:16:05. Contact: ###-####. c/n, stairs, air seal, eave at alley,other insp ok's 7/12/2001 4:59:40 PM
|