BLD01-01687
| BLD-Final | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PASS |
|
|
###-#### demo complete. 7/12/2001 10:18:21 AM
|
BLD01-01732
| BLD-Footing | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 18:53:08. Contact: ###-####.
|
BLD01-01508
| BLD-Foundation | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 11:10:15. Contact: ###-####.
|
BLD01-01396
| BLD-Foundation | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 13:34:43. Contact: ###-####.
|
BLD01-01032
| BLD-Foundation | 7/11/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PART |
|
|
Robert ###-####c/n posted for area with pvc eletrical condiut in footing, engineer has allowed steel schedual 40,will replace and recall. 7/13/2001 8:56:04 AM
|
BLD01-01159
| BLD-Framing/Rough-in | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PASS |
|
|
call first to meet ###-####. Note planing and zoning,will not permit a second floor in this building, at this time construction is as per plans. 7/13/2001 8:54:18 AM
|
BLD01-00729
| BLD-Footing | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PART |
|
|
###-####
|
BLD01-00729
| BLD-Foundation | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PART |
|
|
|
BLD01-00588
| BLD-Framing/Rough-in | 7/12/2001 | 7/12/2001 | 7/12/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 10:54:49. Contact: ###-####. 7/13/2001 8:48:05 AM. need to construct some of the roof area mansard as per the structural details as shown on plans,i have gone over these areas with contractor,will recall before covering. 7/13/2001 8:52:45 AM
|