Inspections for the day of: Thursday, July 12, 2001.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00332 BLD-Energy code compliance7/10/20017/12/20017/12/2001 12:00:00 AMAPASS
scott ###-#### sheet rock crew will keep fireplace open so the fire wall and fire blocking can be inspected also fire blocking for chase backwall of furnace also up stairs fire wall at overbuild this is for all four units 7/13/2001 3:53:16 PM 7/13/2001 4:21:30 PM
BLD01-00331 BLD-Energy code compliance7/10/20017/12/20017/12/2001 12:00:00 AMAPASS
scott ###-#### 7/13/2001 3:47:59 PM see note on 3289 patricia 7/13/2001 3:54:56 PM
BLD01-01533 BLD-Foundation7/11/20017/12/20017/12/2001 12:00:00 AMAPASS
###-####
BLD01-00781 BLD-Framing/Rough-in7/11/20017/12/20017/12/2001 12:00:00 AMAPASS
###-#### roof framing and sheating 7/12/2001 9:45:58 AM
BLD01-01562 BLD-Footing7/11/20017/12/20017/12/2001 12:00:00 AMAPART
bruce ###-#### work in progress checked setbacks all ok 7/12/2001 9:23:36 AM
BLD01-00043 BLD-Final7/11/20017/12/20017/12/2001 12:00:00 AMAFAIL
chuck ###-#### c/n on site 7/12/2001 10:16:31 AM
BLD01-01568 BLD-Framing/Rough-in7/11/20017/12/20017/12/2001 12:00:00 AMAPASS
CHUCK ###-#### SHEAR PANEL ok to cover 7/12/2001 10:29:53 AM
BLD01-01539 BLD-Energy code compliance7/12/20017/12/20017/12/2001 12:00:00 AMAPASS
Added by Inspector: 425 On 7/12/2001 9:57:38 AM all c/n items completed ok to cover
MIS01-00116 BLD-Final7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
###-#### ok for perm occ 7/12/2001 1:35:41 PM
MEC01-02035 Rough-in7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/12/2001 at 10:59:24. Contact: ###-####. still need gas piping done 7/12/2001 3:41:27 PM
MEC01-01719 Rough-in7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/12/2001 at 11:18:21. Contact: ###-####.
MEC01-01720 Rough-in7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/12/2001 at 11:19:12. Contact: ###-####.
MEC01-01721 Rough-in7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/12/2001 at 11:20:01. Contact: ###-####.
MEC01-01722 Rough-in7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/12/2001 at 11:20:41. Contact: ###-####.
BLD01-00912 BLD-Framing/Rough-in7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 7/12/2001 3:47:46 PM framing ok but need truss engineering ok to insulate pluming is done but no sticker on site
BLD01-01574 BLD-Framing/Rough-in7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/12/2001 at 08:10:26. Contact: ###-####. shear nailing ok to cover ext 7/12/2001 1:55:02 PM
MEC01-01935 Final7/12/20017/12/20017/12/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/12/2001 at 08:33:29. Contact: ###-####.
MEC01-02021 Final7/11/20017/12/20017/12/2001 12:00:00 AMPPASS
###-####