BLD02-01036
| BLD-Framing/Rough-in | 7/11/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | A | NR |
|
|
shear nail- shane ###-####
|
BLD02-00947
| BLD-Final | 7/11/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | A | PASS |
|
|
fn occ- dr mays ###-####. ok perm oc. 7/12/2002 11:44:29 AM
|
BLD02-01188
| BLD-Wall cover | 7/11/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 11:40:38. Contact: ###-####.
|
MEC02-01682
| Rough-in | 7/11/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 16:54:07. Contact: ###-####.c/n posted ,for gas test,flue pipe. 7/12/2002 1:05:25 PM
|
BLD02-01209
| BLD-Framing/Rough-in | 7/12/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 06:59:00. Contact: ###-####.
|
BLD02-00862
| BLD-Final | 7/12/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 07:00:56. Contact: ###-####.
|
BLD02-01572
| BLD-Foundation | 7/11/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | A | PART |
|
|
cal ###-#### found wall there are (3) #4 in the wall with verts on 4 foot, the engineer is to supply a new detail for as constructed, contractor on site,said this will be done. Subject to detail. 7/12/2002 1:28:36 PM
|
BLD02-00972
| BLD-Energy code compliance | 7/11/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | P | NR |
|
|
terry- ###-####
|
BLD01-00873
| BLD-Energy code compliance | 7/11/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | P | PASS |
|
|
roger - ###-####also framing ok. 7/12/2002 1:57:30 PM
|
BLD02-00018
| BLD-Framing/Rough-in | 7/12/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | P | FAIL |
|
|
###-####posted a c/n. 7/12/2002 5:03:59 PM
|
BLD02-01450
| BLD-Footing | 7/12/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | P | FAIL |
|
|
###-####. Posted a c/n on job card , to provide 24 In depth at entire footing, as per approved plans. Also told this to concrete contractor at the site. Note: concrete truck is at the site now , If I was here 15 min later it would have been poured. Also note very poor plans. Just a typical wall elevation hand out from Boise City which does not pertain to construction at the job site. But has been approved by the plan reveiwer. 7/12/2002 4:10:18 PM
|
BLD02-01450
| BLD-Footing | 7/12/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | P | FAIL |
|
|
###-####. Posted a c/n on job card , to provide 24 In depth at entire footing, as per approved plans. Also told this to concrete contractor at the site. Note: concrete truck is at the site now , If I was here 15 min later it would have been poured. Also note very poor plans. Just a typical wall elevation hand out from Boise City which does not pertain to construction at the job site. But has been approved by the plan reveiwer. 7/12/2002 4:10:18 PM
|
BLD01-02706
| BLD-Footing | 7/11/2002 | 7/12/2002 | 7/12/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 15:53:10. Contact: ###-####.interior footings ok. 7/12/2002 5:02:15 PM
|