Inspections for the day of: Friday, July 12, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01036 BLD-Framing/Rough-in7/11/20027/12/20027/12/2002 12:00:00 AMANR
shear nail- shane ###-####
BLD02-00947 BLD-Final7/11/20027/12/20027/12/2002 12:00:00 AMAPASS
fn occ- dr mays ###-####. ok perm oc. 7/12/2002 11:44:29 AM
BLD02-01188 BLD-Wall cover7/11/20027/12/20027/12/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/11/2002 at 11:40:38. Contact: ###-####.
MEC02-01682 Rough-in7/11/20027/12/20027/12/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/11/2002 at 16:54:07. Contact: ###-####.c/n posted ,for gas test,flue pipe. 7/12/2002 1:05:25 PM
BLD02-01209 BLD-Framing/Rough-in7/12/20027/12/20027/12/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/12/2002 at 06:59:00. Contact: ###-####.
BLD02-00862 BLD-Final7/12/20027/12/20027/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/12/2002 at 07:00:56. Contact: ###-####.
BLD02-01572 BLD-Foundation7/11/20027/12/20027/12/2002 12:00:00 AMAPART
cal ###-#### found wall there are (3) #4 in the wall with verts on 4 foot, the engineer is to supply a new detail for as constructed, contractor on site,said this will be done. Subject to detail. 7/12/2002 1:28:36 PM
BLD02-00972 BLD-Energy code compliance7/11/20027/12/20027/12/2002 12:00:00 AMPNR
terry- ###-####
BLD01-00873 BLD-Energy code compliance7/11/20027/12/20027/12/2002 12:00:00 AMPPASS
roger - ###-####also framing ok. 7/12/2002 1:57:30 PM
BLD02-00018 BLD-Framing/Rough-in7/12/20027/12/20027/12/2002 12:00:00 AMPFAIL
###-####posted a c/n. 7/12/2002 5:03:59 PM
BLD02-01450 BLD-Footing7/12/20027/12/20027/12/2002 12:00:00 AMPFAIL
###-####. Posted a c/n on job card , to provide 24 In depth at entire footing, as per approved plans. Also told this to concrete contractor at the site. Note: concrete truck is at the site now , If I was here 15 min later it would have been poured. Also note very poor plans. Just a typical wall elevation hand out from Boise City which does not pertain to construction at the job site. But has been approved by the plan reveiwer. 7/12/2002 4:10:18 PM
BLD02-01450 BLD-Footing7/12/20027/12/20027/12/2002 12:00:00 AMPFAIL
###-####. Posted a c/n on job card , to provide 24 In depth at entire footing, as per approved plans. Also told this to concrete contractor at the site. Note: concrete truck is at the site now , If I was here 15 min later it would have been poured. Also note very poor plans. Just a typical wall elevation hand out from Boise City which does not pertain to construction at the job site. But has been approved by the plan reveiwer. 7/12/2002 4:10:18 PM
BLD01-02706 BLD-Footing7/11/20027/12/20027/12/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/11/2002 at 15:53:10. Contact: ###-####.interior footings ok. 7/12/2002 5:02:15 PM