MEC06-02262
| Final | 7/12/2006 | 7/12/2006 | 7/12/2006 3:35:43 PM | P | PASS |
|
|
mike - the later the better; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
MEC05-03858
| Final | 7/12/2006 | 7/12/2006 | 7/12/2006 3:35:32 PM | P | PASS |
|
|
The builder says that people will be there working this pm to let you in. Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|
MEC06-02280
| Pressure Test | 7/11/2006 | 7/12/2006 | 7/12/2006 3:20:06 PM | A | NR |
|
|
Jerry is contact. Thanks.; Phone #: ###-#### Internet Inspection Request from: Mike Davisson
|
MEC06-01579
| Rough-in | 7/12/2006 | 7/12/2006 | 7/12/2006 2:46:48 PM | P | PASS |
|
|
correction has been made and is ready for reinspection. Thanks! Internet Inspection Request from: Shelley Baisch
|
MEC05-04294
| Rough-in | 7/12/2006 | 7/12/2006 | 7/12/2006 2:26:46 PM | P | PASS |
|
|
fsd at 5th floor and shaft at vending from sixth to 11the floor, still need shaft built around duct that terminates exterior
|
MEC06-01993
| Rough-in | 7/11/2006 | 7/12/2006 | 7/12/2006 11:59:06 AM | A | FAIL |
|
|
IF LOCKED CALL RICH@ ###-####; Phone #: ###-#### Internet Inspection Request from: Stacy Ware gas test failed, bad guage stuck at 25lb, ok to cover rough inspection
|
MEC06-02281
| Pressure Test | 7/11/2006 | 7/12/2006 | 7/12/2006 11:46:43 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt gas piping appears to be undersized
|
MEC06-02281
| Rough-in | 7/11/2006 | 7/12/2006 | 7/12/2006 11:46:17 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt c/n posted
|
MEC06-02277
| Rough-in | 7/11/2006 | 7/12/2006 | 7/12/2006 11:45:59 AM | A | PASS |
|
|
Internet Inspection Request from: Shelley Baisch
|
MEC06-02059
| Pressure Test | 7/11/2006 | 7/12/2006 | 7/12/2006 11:45:48 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 3:59:19 PM. Contact: ###-####.
|
MEC06-02059
| Rough-in | 7/11/2006 | 7/12/2006 | 7/12/2006 11:45:39 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 3:58:46 PM. Contact: ###-####.
|
MEC05-02306
| Pressure Test | 7/11/2006 | 7/12/2006 | 7/12/2006 10:25:34 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 4:34:48 PM. Contact: ###-####.
|
MEC05-02306
| Final | 7/12/2006 | 7/12/2006 | 7/12/2006 10:25:23 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 4:34:48 PM. Contact: ###-####.
|
MEC06-02220
| Pressure Test | 7/11/2006 | 7/12/2006 | 7/12/2006 9:19:38 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 11:16:31 AM. Contact: ###-####.
|
MEC06-02220
| Rough-in | 7/11/2006 | 7/12/2006 | 7/12/2006 9:19:30 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 11:16:23 AM. Contact: ###-####.
|
MEC06-02221
| Pressure Test | 7/11/2006 | 7/12/2006 | 7/12/2006 9:17:58 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 11:15:56 AM. Contact: ###-####.
|
MEC06-02221
| Rough-in | 7/11/2006 | 7/12/2006 | 7/12/2006 9:17:12 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 11:15:42 AM. Contact: ###-####. revise permit to show two furnaces and two air conditioners, gas test failed, need two foot wide platform from attic access to furnace
|
MEC06-02255
| Pressure Test | 7/11/2006 | 7/12/2006 | 7/12/2006 9:16:01 AM | A | PASS |
|
|
|