Inspections for the day of: Thursday, July 12, 2007.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00212 FIR-Aging Inspection7/12/20077/12/20077/13/2007 12:57:46 PM NR
Work has not started on the project yet
FIR07-00196 INSP-Supply line flush7/12/20077/12/20077/13/2007 12:42:42 PMPCANC
Duplicate inspection
FIR07-00595 INSP-Sprinkler Rough-in7/12/20077/12/20077/13/2007 9:34:08 AMPPASS
The underground supply piping from the building out approximately 20' is ok to cover. See the city approved plans for the piping reroute around the building footing. I asked Stan to have his office show this change on the overhead submittals so that it is included in the hydraulic calculations.
FIR07-00533 INSP-Final Inspection7/12/20077/12/20077/12/2007 12:12:07 PMPPASS
Permit finaled. An earthquake brace still needs to be installed on the new sprig up. This will be checked at the building final.
FIR07-00196 INSP-Sprinkler Rough-in/Hydro7/12/20077/12/20077/12/2007 12:08:57 PMPPASS
The anti-freeze system and underground supply hydro test passed. I also did a life safety walk through with the general contractor.
FIR06-00518 INSP-Final Inspection7/11/20077/12/20077/12/2007 11:00:49 AMAPASS
Permit finaled
BLD07-00465 FIRE-Final Inspection7/11/20077/12/20077/12/2007 10:44:51 AMAFAIL
Repair exit sign in the store room, provide earthquake bracing on the new sprig up in the store room and provide approved hardware on the restroom door. The smoke evac system and the duct detector performed as required.
BLD07-01139 FIRE-Final Inspection7/12/20077/12/20077/12/2007 10:43:05 AMPPASS
Life safety passed.
FIR07-00429 INSP-Final Inspection7/11/20077/12/20077/12/2007 10:42:34 AMAPASS
Permit finaled
FIR05-00536 INSP-Sprinkler Rough-in7/11/20077/12/20077/12/2007 9:06:09 AMAPASS
The 2" fill line to the secondary storage tank was flushed. Also see the city approved plans for corridors and rooms on the second floor and first floor where piping is ok to cover. I also looked at the piping that will be above the Rulon ceiling in the first floor elevator lobby but did not give the ok to cover since this area has been resubmitted.