Inspections for the day of: Monday, July 12, 2010.
Number of inspections: 10
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00109 INSP-Conference7/2/20107/7/2010 A 
Follow up conference with Mike; ###-####
FIR04-00655 INSP-Final Inspection7/12/20107/12/20107/14/2010 2:47:06 PMPFAIL
The duct smoke detector was mounted incorrectly so it was not tested. The missing high/low pressure switch will be handled by prevention. If not included on this permit as an as-built a separate permit will be required when it is added to the existing fire alarm system.
BLD10-01321 FIRE-Conference7/12/20107/12/20107/14/2010 11:07:31 AMPDONE
I went over life safety requirements with jim which included the hood suppression system.
FIR04-00655 INSP-Final Inspection7/9/20107/12/20107/12/2010 4:20:30 PMACANC
Duplicate inspection
BLD10-01039 FIRE-Final Inspection7/12/20107/12/20107/12/2010 4:20:02 PMPCANC
Cancelled due to time constraints.
BLD09-00980 FIRE-Final Inspection7/9/20107/12/20107/12/2010 3:42:40 PMAFAIL
The project related fire sprinkler permit needs addressed and "indicators" and "stickers" shall be provided per IFC 1008.1.8.3 (2.1) and (2.2) at doors 126A, 130A and 132B.
FIR10-00236 INSP-Final Inspection7/8/20107/12/20107/12/2010 3:35:25 PMAFAIL
the forward flush test failed again
FIR10-00245 INSP-Final Inspection7/12/20107/12/20107/12/2010 3:33:48 PMPPASS
permit finaled
FIR05-00727 INSP-Sprinkler Rough-in7/12/20107/12/20107/12/2010 3:32:37 PMPPASS
permit finaled
BLD10-01260 FIRE-Final Inspection7/9/20107/12/20107/12/2010 3:29:40 PMAPART
A temporary occupancy was given until the project related fire alarm work has been submitted, approved and inspected.