ELE11-01515
| Electrical Rough-In | 7/11/2011 | 7/12/2011 | 7/12/2011 2:55:32 PM | P | NR |
|
|
Contact: Casey Fouts Phone #: ###-#### >> Inspection requested via web by Deb Gooden met electrician, no mud rings, running conduit, tie wraps prevented 1 1/4" in steel studs, told to call when done
|
ELE11-01514
| Conference | 7/11/2011 | 7/12/2011 | 7/12/2011 2:04:53 PM | P | DONE |
|
|
Carl-please call prior to inspection Phone #: ###-#### talked about outlet spacing, building to code, framing to be done, when to call for inspection, going to be difficult, because they 1/2 live in dwelling, installed material that is temporary is not to code, reviewed free conductor length, circuiting, stapling, nailplates,etc
|
ELE11-01528
| Temporary Service | 7/12/2011 | 7/12/2011 | 7/12/2011 12:29:09 PM | P | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman called, left message, check that ground rod is down far enough and that clearance of 8' over garage is provided, did not open service, did not see job id sticker, fee due
|
ELE11-01513
| Electrical Rough-In | 7/11/2011 | 7/12/2011 | 7/12/2011 10:11:11 AM | A | PASS |
|
|
Mucho ###-#### ri ok
|
ELE11-01513
| Final | 7/12/2011 | 7/12/2011 | 7/12/2011 10:10:57 AM | A | PASS |
|
|
Mucho ###-#### ok final
|
ELE10-01645
| ELE-Aging Inspection | 7/12/2011 | 7/12/2011 | 7/12/2011 9:35:57 AM | | DONE |
|
|
still under construction
|
ELE11-01478
| Electrical Rough-In | 7/11/2011 | 7/12/2011 | 7/12/2011 9:34:34 AM | A | PASS |
|
|
vance Phone #: ###-#### ok cover u/g house to hot tub location nw corner lot
|
ELE11-01110
| Final | 7/11/2011 | 7/12/2011 | 7/12/2011 8:52:48 AM | A | PASS |
|
|
Please call with any questions thanks Brad Phone #: ###-#### >> Inspection requested via web by Brad Baker corrections made, ok final, signed card
|
ELE08-02423
| Electrical Rough-In | 7/11/2011 | 7/12/2011 | 7/12/2011 8:16:27 AM | A | PASS |
|
|
JASON SOFFITS B3 COMMON AREAS Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok cover ceilings anop, kitchen, rest room, guest suite
|
ELE10-02498
| ELE-Aging Inspection | 7/12/2011 | 7/12/2011 | 7/12/2011 6:41:41 AM | | DONE |
|
|
see final
|
ELE10-02498
| Final | 7/12/2011 | 7/12/2011 | 7/12/2011 6:41:29 AM | A | PASS |
|
|
ok final
|
ELE10-02500
| ELE-Aging Inspection | 7/12/2011 | 7/12/2011 | 7/12/2011 6:40:40 AM | | DONE |
|
|
see final
|
ELE10-02500
| Final | 7/12/2011 | 7/12/2011 | 7/12/2011 6:40:26 AM | A | PASS |
|
|
ok final
|
ELE10-01793
| ELE-Aging Inspection | 7/12/2011 | 7/12/2011 | 7/12/2011 6:39:11 AM | | DONE |
|
|
still under construction
|