FIR10-00583
| INSP-Sprinkler Rough-in | 7/11/2011 | 7/12/2011 | 7/12/2011 4:48:08 PM | P | FAIL |
|
|
Incompleted C/N items.
|
FIR10-00583
| INSP-Supply line flush | 7/11/2011 | 7/12/2011 | 7/12/2011 4:46:36 PM | P | NR |
|
|
request for flush. Please call Miguel 1 hr before(###-####). Would also like to complete this the same time as our rough-to-cover for the corrections from our last inspection. Phone #: ###-#### >> Inspection requested via web by Trent Bice
|
BLD11-00969
| FIRE-Conference | 7/12/2011 | 7/12/2011 | 7/12/2011 4:46:06 PM | P | DONE |
|
|
On site conference regarding existing building fire alarm and sprinkler systems and related modifications due to remodel work.
|
FIR08-00239
| INSP-Sprinkler Rough-in | 7/12/2011 | 7/12/2011 | 7/12/2011 4:43:34 PM | P | PART |
|
|
Ref. dated plan annotations.
|
FIR11-00235
| INSP-Final Inspection | 7/11/2011 | 7/12/2011 | 7/12/2011 4:42:57 PM | P | PASS |
|
|
Fire sprinkler work passed field inspection. Permit finaled.
|
FIR11-00137
| INSP-Final Inspection | 7/11/2011 | 7/12/2011 | 7/12/2011 4:41:52 PM | P | PASS |
|
|
Verified revised plans match installation. Fire sprinkler permit finaled.
|
FIR08-00239
| INSP-Sprinkler Rough-in | 7/11/2011 | 7/12/2011 | 7/12/2011 4:40:20 PM | A | PART |
|
|
Units A2 and D2 4th floor building #2 okayed for cover at the sheetrock soffits. Also noted on plans areas on the 1st floor buildings# 2 and 3 approved for cover including restrooms, breakroom/kitchen, common area- marked with todays date.
|