FIR11-00247
| INSP-Sprinkler Rough-in | 7/12/2011 | 7/12/2011 | 7/12/2011 3:24:21 PM | P | PASS |
|
|
Thrust block has been poured. Remaining underground ok to cover.
|
FIR11-00247
| INSP-Sprinkler Rough-in | 7/12/2011 | 7/12/2011 | 7/12/2011 3:13:15 PM | P | PASS |
|
|
The undergorund piping up to the 90 into the new building is ok for cover.
|
FIR11-00095
| INSP-Sprinkler Rough-in/Hydro | 7/11/2011 | 7/12/2011 | 7/12/2011 2:20:05 PM | A | PASS |
|
|
The corrections have been made for the office area sprinkler piping rough-in. Another rough-in inspection will still need to be performed for the installation of the pendant arm-overs prior to an approval for cover.
|
BLD10-02646
| FIRE-Final Inspection | 7/11/2011 | 7/12/2011 | 7/12/2011 2:18:34 PM | P | PASS |
|
|
life safety passed.
|