ELE13-01778
| ELE-Aging Inspection | 7/12/2016 | 7/12/2016 | 7/14/2016 8:09:10 AM | | CANC |
|
|
|
ELE13-01214
| ELE-Aging Inspection | 7/12/2016 | 7/12/2016 | 7/14/2016 8:08:14 AM | | CANC |
|
|
|
ELE16-02223
| Permanent Service | 7/12/2016 | 7/12/2016 | 7/12/2016 2:11:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley p/s u/g rec ok
|
ELE16-01750
| Electrical Rough-In | 7/12/2016 | 7/12/2016 | 7/12/2016 1:33:16 PM | P | PASS |
|
|
Robert. Wall cover kitchen area. Phone #: ###-#### Inspection requested via web by Sean DeLacy Kitchen area walls and ceiling rough in ok cover
|
ELE16-01582
| Final | 7/11/2016 | 7/12/2016 | 7/12/2016 12:27:31 PM | A | PASS |
|
|
Please call owner (Chris at ###-####) with at least 15 minutes notice so she can have it open. Thanks, Barbara Phone #: ###-#### Inspection requested via web by Barbara Szurgot Kitchen and dining only. Final ok
|
ELE16-02207
| Final | 7/11/2016 | 7/12/2016 | 7/12/2016 11:35:48 AM | A | PASS |
|
|
John Phone #: ###-#### Final ok
|
ELE16-02207
| Permanent Service | 7/12/2016 | 7/12/2016 | 7/12/2016 11:33:01 AM | P | PASS |
|
|
John Phone #: 208-866- Replaced triplex due to damage. p/s o/h rec ok
|
ELE16-02213
| Electrical Rough-In | 7/12/2016 | 7/12/2016 | 7/12/2016 10:45:45 AM | A | FAIL |
|
|
lock box is on hand rail code is 2323 Phone #: ###-#### Inspection requested via web by Jay Symonds 517.13- All receptacles located in patient care areas shall have metallic raceway installed as identified in 250.118. Alluminum flex shall not be installed in lengths exceeding 6' for effective fault path.
|
ELE15-02641
| Electrical Rough-In | 7/11/2016 | 7/12/2016 | 7/12/2016 9:56:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 601 only drop lids rough in ok cover
|
ELE16-01838
| Electrical Rough-In | 7/11/2016 | 7/12/2016 | 7/12/2016 9:34:46 AM | A | PASS |
|
|
level 6 stack 2 ceiling inspection Phone #: ###-#### Inspection requested via web by Brandon Robinson Level 6 stack 1 300.11- Low volt cables shall be supported independant of ceiling support system. Level 6 stack 2 ceiling and level 8 bathroom lids rough in ok cover
|