FIR16-00088
| INSP-Sprinkler Rough-in | 7/12/2016 | 7/12/2016 | 7/12/2016 1:41:11 PM | P | PASS |
|
|
Underground rough to cover inspection complete, underground approved for cover.
|
FIR15-00878
| INSP-Final Inspection | 7/12/2016 | 7/12/2016 | 7/12/2016 11:20:08 AM | P | PASS |
|
|
Hydrostatic test complete for underground and overhead fire sprinklers. Final fire sprinkler inspection passed/complete.
|
FIR16-00269
| INSP-Conference | 7/8/2016 | 7/12/2016 | 7/12/2016 10:37:31 AM | A | DONE |
|
|
Fire conference complete, testing cannot be done on hood suppression system until integration with commercial hood to fire alarm system is complete. Fuel source needs to be active at time of inspection to verify energy source isolation during inspection of hood suppression activation.
|
FIR16-00370
| INSP-Final Inspection | 7/11/2016 | 7/12/2016 | 7/12/2016 9:00:42 AM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete.
|
FIR16-00370
| INSP-Sprinkler Rough-in | 7/11/2016 | 7/12/2016 | 7/12/2016 8:59:48 AM | P | PASS |
|
|
Overhead fire sprinkler piping rough in inspection complete.
|
FIR16-00428
| INSP-Sprinkler Rough-in | 7/11/2016 | 7/12/2016 | 7/12/2016 8:41:46 AM | A | PASS |
|
|
Rough to cover inspection complete for overhead fire sprinklers installed, overhead fire sprinklers installed per scope of work approved for cover.
|
FIR15-00751
| INSP-Conference | 7/11/2016 | 7/12/2016 | 7/12/2016 8:29:32 AM | A | DONE |
|
|
Conference complete, tested flow switches and valve tamper switches for levels 1 throught 9 and wet pipe sprinkler systems, all tested satisfactorily.
|