MEC17-02951
| Final | 7/12/2017 | 7/12/2017 | 7/12/2017 4:02:53 PM | P | PASS |
|
|
call Chuck ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC17-02632
| Rough-in | 7/11/2017 | 7/12/2017 | 7/12/2017 3:41:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
MEC17-02912
| Final | 7/11/2017 | 7/12/2017 | 7/12/2017 3:08:00 PM | P | PASS |
|
|
Please call our installer, Brandan at ###-#### Phone #: ###-#### Inspection requested via web by Ben Welgan
|
MEC17-02956
| Pressure Test | 7/12/2017 | 7/12/2017 | 7/12/2017 2:17:28 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass- 5lb flue fail
|
MEC17-02956
| Rough-in | 7/12/2017 | 7/12/2017 | 7/12/2017 2:16:59 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- insulate supply and R/A in garage between sheetrock ceiling and second floor- flue fail- master bedroom R/A flex kinked off tap needs to flow smoothly-bedroom #4 R/A kinked/ pinched need to flow smoothly- left correction notice on supply duct at furnace
|
MEC17-02915
| Final | 7/11/2017 | 7/12/2017 | 7/12/2017 1:23:45 PM | P | PASS |
|
|
Please call Dwight @ ###-#### to confirm job is ready for inspection. Thank you. Phone #: ###-#### Inspection requested via web by Rick Borg
|
MEC17-01104
| Final | 7/11/2017 | 7/12/2017 | 7/12/2017 11:55:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by jeff jedlick
|
MEC17-02650
| Final | 7/11/2017 | 7/12/2017 | 7/12/2017 11:36:08 AM | A | PART |
|
|
DOOR CODE IS HCD Phone #: ###-#### Inspection requested via web by Joseph Profitt- moveable equipment needs tethered (general contractor was placing appliances)- need to do final inspection on hood with other contractor before finaling this permit out- will final out on there final
|
MEC17-02826
| Pressure Test | 7/11/2017 | 7/12/2017 | 7/12/2017 10:45:12 AM | P | CANC |
|
|
>> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|
MEC17-02826
| Rough-in | 7/11/2017 | 7/12/2017 | 7/12/2017 10:45:11 AM | P | CANC |
|
|
>> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|
MEC17-02904
| Final | 7/11/2017 | 7/12/2017 | 7/12/2017 10:37:30 AM | A | PASS |
|
|
Contact Dave Williams. thank you Phone #: ###-#### Inspection requested via web by karla cleveland
|
MEC17-01690
| Final | 7/11/2017 | 7/12/2017 | 7/12/2017 9:36:59 AM | A | PASS |
|
|
mechanical fireplace final inspeciton Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC17-02903
| Rough-in | 7/11/2017 | 7/12/2017 | 7/12/2017 9:16:43 AM | A | PASS |
|
|
TIM ###-#### Phone #: ###-#### Inspection requested via web by Jason Robinson
|
MEC17-01403
| Final | 7/11/2017 | 7/12/2017 | 7/12/2017 9:04:52 AM | A | PASS |
|
|
BRAXTON ###-#### Phone #: ###-#### Inspection requested via web by Jason Robinson
|
MEC17-00611
| Final | 7/11/2017 | 7/12/2017 | 7/12/2017 8:50:54 AM | A | PASS |
|
|
Field Super: Daryl Thomas Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
MEC16-02659
| Mec-Aging Inspection | 7/12/2017 | 7/12/2017 | 7/12/2017 8:19:34 AM | | PEND |
|
|
contractor still trying to schedule
|
MEC17-02826
| Pressure Test | 7/11/2017 | 7/12/2017 | 7/11/2017 1:11:03 PM | A | CANC |
|
|
>> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|
MEC17-02826
| Rough-in | 7/11/2017 | 7/12/2017 | 7/11/2017 1:11:01 PM | A | CANC |
|
|
>> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|