FIR16-00821
| INSP-Sprinkler Rough-in | 7/11/2017 | 7/12/2017 | 7/12/2017 2:39:58 PM | P | FAIL |
|
|
No inspection was performed due to insulation work has not been completed
|
NAF17-00020
| INSP-Supply line flush | 7/11/2017 | 7/12/2017 | 7/12/2017 2:28:15 PM | P | CANC |
|
|
Not ready for flush yet
|
BLD17-00514
| FIRE-Final Inspection | 7/11/2017 | 7/12/2017 | 7/12/2017 2:27:30 PM | A | PASS |
|
|
life safety passed
|
BLD17-00840
| FIRE-Final Inspection | 7/12/2017 | 7/12/2017 | 7/12/2017 1:33:20 PM | P | CANC |
|
|
Not ready for final life safety due to the project related fire alarm permit
|
FIR17-00082
| INSP-Sprinkler Rough-in/Hydro | 7/11/2017 | 7/12/2017 | 7/12/2017 12:51:37 PM | A | PART |
|
|
The overhead hydro passed and rough to cover inspection failed due to the draft stops obstructing the CC2 heads. Also the floor plan does not match and the inspectors test is not shown so as-builts are needed for the next inspection and also for the plan reviewer.
|
FIR17-00362
| INSP-Alarm Testing | 7/11/2017 | 7/12/2017 | 7/12/2017 12:18:54 PM | A | FAIL |
|
|
Audible portion of the horn/strobes did not sync.
Stan Phone #: ###-####
|
NAF17-00020
| INSP-Sprinkler Rough-in/Hydro | 7/11/2017 | 7/12/2017 | 7/12/2017 12:10:30 PM | A | PASS |
|
|
The underground hydro test passed. Flush was not ready
|