Inspections for the day of: Thursday, July 12, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM17-03990 PLM-Aging Inspection7/12/20187/12/20187/12/2018 4:15:59 PM PASS
PLM17-03990 DOC - Permit Expired7/12/20187/12/20187/12/2018 4:15:51 PMPPASS
Failed to schdule
PLM17-03105 PLM-Aging Inspection7/12/20187/12/20187/12/2018 4:14:32 PM PASS
PLM17-03105 DOC - Permit Expired7/12/20187/12/20187/12/2018 4:14:22 PMPPASS
final inspection never scheduled as requested.
PLM17-04008 PLM-Aging Inspection7/12/20187/12/20187/12/2018 4:12:53 PM PART
left a message to call with an update on the project
PLM17-03002 DOC - Permit Expired7/12/20187/12/20187/12/2018 3:57:29 PMPPASS
failed to schedule
PLM18-02941 Plumbing Rough-in7/12/20187/12/20187/12/2018 3:05:45 PMPPASS
Phone #: ###-#### Inspection requested via web by Robert Madrigal.
Ground work and rough-in ok
PLM18-02939 Groundwork7/12/20187/12/20187/12/2018 2:37:55 PMPPASS
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS.
Looked at the water service. OK to cover except the joints-not tested yet
PLM18-02938 Water and/or Sewer7/12/20187/12/20187/12/2018 2:09:53 PMPNR
Phone #: ###-#### Inspection requested via web by john brown
PLM18-01592 Final7/11/20187/12/20187/12/2018 1:57:11 PMPPASS
3162 ENTER Inspection requested via web by Ann Marie Reyes
PLM18-02933 Plumbing Rough-in7/11/20187/12/20187/12/2018 12:49:22 PMAPASS
lock box on suite 124 door call nels for code, thanks Phone #: ###-#### Inspection requested via web by Nels Moore.
The T&P will need to be hard piped and an expansion tank added for a final
PLM18-01141 Final7/11/20187/12/20187/12/2018 10:45:35 AMAFAIL
Certify rp for the carbonator.
PLM17-03541 Final7/11/20187/12/20187/12/2018 10:43:44 AMAPART
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
Add backflow protection to the roof hydrants or feed from the non-potable line and label.
PLM18-01943 Plumbing Rough-in7/11/20187/12/20187/12/2018 9:25:16 AMAFAIL
Walked with Eric when he was ot talk with him on cleanouts was good with all the cleanouts in basement only since owner of building owns all units guage ln upstairs kitchen drain and upstairs lav drain. Water live pressure Phone #: ###-#### Inspection requested via web by Mark Kelso.
Both units require a water softener rought-in with hard water run to the kitchen sink.
PLM18-02661 Plumbing Rough-in7/11/20187/12/20187/12/2018 9:02:03 AMAPASS
Tami Phone #: ###-####
PLM18-01473 Final7/11/20187/12/20187/12/2018 9:02:02 AMAPASS
Alan Phone #: ###-####