MEC19-01806
| Final | 7/11/2019 | 7/12/2019 | 7/12/2019 12:49:45 PM | A | PASS |
|
|
CLINT ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza
|
MEC19-02854
| Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 10:24:11 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt Retest gas line after relocating. Remove screen from dry roof termination. Insulation shield required at b-vent in attic
|
MEC19-02854
| Pressure Test | 7/11/2019 | 7/12/2019 | 7/12/2019 10:22:07 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt Test was removed by the plumber. Gas line to is to be relocated to different location. Need to retest gas line.
|
MEC19-01699
| Final | 7/11/2019 | 7/12/2019 | 7/12/2019 9:49:01 AM | A | PASS |
|
|
Please call Delroy at least 30 min prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|