BLD19-02367
| BLD-Final | 7/11/2019 | 7/12/2019 | 7/12/2019 4:01:37 PM | P | PASS |
|
|
Inspection requested via web by BRS Permitting//ok per plans//electrical final complete//
|
BLD19-02367
| DOC - Permit Finaled | 7/12/2019 | 7/12/2019 | 7/12/2019 4:00:57 PM | P | PASS |
|
|
|
BLD18-04337
| BLD-Final | 7/10/2019 | 7/12/2019 | 7/12/2019 3:59:01 PM | P | NR |
|
|
Mac Phone #: ###-####//need blower door test completed and results posted//
|
BLD19-00556
| BLD-Footing | 7/12/2019 | 7/12/2019 | 7/12/2019 3:21:24 PM | P | FAIL |
|
|
need to string easment line for canal//NE corner of house will be on easment line//call for re-inspection//
|
BLD19-00556
| BLD-Conference | 7/12/2019 | 7/12/2019 | 7/12/2019 3:19:32 PM | P | CANC |
|
|
damion Phone #: ###-####
|
BLD19-02086
| BLD-Final | 7/11/2019 | 7/12/2019 | 7/12/2019 2:48:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Michael La Pointe//roof appears to be installed within code requirements//
|
BLD19-02086
| DOC - Permit Finaled | 7/12/2019 | 7/12/2019 | 7/12/2019 2:48:20 PM | P | PASS |
|
|
|
BLD19-01724
| BLD-Foundation | 7/12/2019 | 7/12/2019 | 7/12/2019 2:36:58 PM | P | PASS |
|
|
Jerry- foundation wall Phone #: ###-####
|
BLD19-01806
| BLD-Foundation | 7/12/2019 | 7/12/2019 | 7/12/2019 2:08:10 PM | P | CANC |
|
|
Jerry- foundation wall Phone #: ###-####
|
BLD19-01154
| BLD-Wall Bracing | 7/12/2019 | 7/12/2019 | 7/12/2019 1:52:38 PM | P | FAIL |
|
|
shear // shawn Phone #: ###-####//correction notice posted//finish portal frame// verify portal frame over windows//add blocking per plans//
|
BLD19-02258
| BLD-Footing | 7/12/2019 | 7/12/2019 | 7/12/2019 12:48:06 PM | P | PASS |
|
|
Brian Phone #: ###-####//setbacks per approved plans//tight on 3' garage side//verify 3' at wall inspection//
|
BLD19-00228
| BLD-Framing/Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 11:44:44 AM | A | PASS |
|
|
Tell we have all the other inspector coming also to sign off on hv/ac and plumbing rough in. Maybe give me a call before your arrival. Phone #: ###-#### Inspection requested via web by Russell Valline//rough ins all passed//ok to cover framing//
|
BLD18-03121
| BLD-Framing/Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 11:05:12 AM | A | PASS |
|
|
Matt Phone #: ###-####//corrections made//rough-ins passed//105,106,205,206,305,306//
|
BLD19-01620
| BLD-Final | 7/11/2019 | 7/12/2019 | 7/12/2019 10:29:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Michael La Pointe//previously passed//maybe wasnt Fast Finaled??//roof complete//
|
BLD19-01620
| DOC - Permit Finaled | 7/12/2019 | 7/12/2019 | 7/12/2019 10:28:50 AM | P | PASS |
|
|
|
BLD19-01856
| BLD-Footing | 7/10/2019 | 7/12/2019 | 7/12/2019 10:22:34 AM | A | PART |
|
|
Structural inspection on rebar in swimming pool in back yard. Plans and permits are on site and in a PVC pipe secured to T post near pool. Phone #: ###-#### Inspection requested via web by Brandy McConkey//maintain rebar clearances per plans///Dobies on side near house fell in//re-attach//
|
BLD19-01431
| BLD-Framing/Rough-in | 7/12/2019 | 7/12/2019 | 7/12/2019 10:04:14 AM | A | PART |
|
|
Add hangers to jack trusses in front room on small hip//ok to insulate
|
BLD19-01431
| BLD-Energy code compliance | 7/11/2019 | 7/12/2019 | 7/12/2019 10:02:16 AM | A | CANC |
|
|
vinnie Phone #: ###-####
|
BLD19-01694
| BLD-Footing | 7/11/2019 | 7/12/2019 | 7/12/2019 9:30:43 AM | A | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//set back issues corrected//
|
BLD19-00244
| BLD-Blower Door Test Results | 7/12/2019 | 7/12/2019 | 7/12/2019 9:30:09 AM | A | DONE |
|
|
4.01 ACH 50 1280cfm @ 50 pa
|
BLD19-00244
| BLD-Final | 7/11/2019 | 7/12/2019 | 7/12/2019 9:28:38 AM | A | PASS |
|
|
Willie Phone #: ###-####//corrections made//
|
BLD19-00244
| DOC - Permit Finaled | 7/12/2019 | 7/12/2019 | 7/12/2019 9:28:15 AM | P | PASS |
|
|
|
BLD19-00839
| BLD-Energy code compliance | 7/11/2019 | 7/12/2019 | 7/12/2019 8:55:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Aron Mock
|
BLD19-00125
| BLD-Framing/Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 8:46:22 AM | A | FAIL |
|
|
Vaugh Phone #: ###-####//add straps per plans//HDU anchors need 5" in concrete//need truss plans//correction notice posted..//
|