Inspections for the day of: Friday, July 13, 2007.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00959 INSP-Sprinkler Rough-in/Hydro7/12/20077/13/20077/13/2007 5:29:53 PMPPART
Red lined areas on approved plans where the OH install is okay for cover, noted one pendent does not match response type-location indicated on plans.
FIR07-00205 INSP-Sprinkler Rough-in/Hydro7/12/20077/13/20077/13/2007 5:26:59 PMAPART
OH hydrostatic testing completed acceptable, rough-in reinspect for the fan deck area failed due to missing hanger at added arm-over to a head beneath a duct at the NW corridor, also installed incorrect size rings at added branch line hangers in the fan attic 201D, stair #4 200Y is not complete at this time.
FIR07-00312 INSP-Final Inspection7/12/20077/13/20077/13/2007 5:21:32 PMAPASS
Final fire sprinkler field inspection passed, noted main drain connection to be piped outside or to an area that will not cause water damage when operated, contractor to have BFP certified today per agreement.
FIR06-00940 INSP-Sprinkler Rough-in/Hydro7/12/20077/13/20077/13/2007 5:17:23 PMAPART
OH hydrostatic testing passed inspection.
FIR07-00312 INSP-Supply line flush7/12/20077/13/20077/13/2007 5:16:22 PMAPART
UG supply line flush completed satisfactory.