MEC07-01558
| Final | 7/12/2007 | 7/13/2007 | 7/13/2007 5:25:11 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans
|
MEC07-02423
| Rough-in | 7/13/2007 | 7/13/2007 | 7/13/2007 5:24:43 PM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims..r/i ok...gas not done yet??
|
MEC07-02287
| Pressure Test | 7/12/2007 | 7/13/2007 | 7/13/2007 5:23:40 PM | A | FAIL |
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang..call for conference
|
MEC07-01132
| Final | 7/13/2007 | 7/13/2007 | 7/13/2007 4:04:29 PM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/13/2007 at 6:35:53 AM. Contact: ###-####....outside shut-off valve for f/p in living room?
|
MEC07-00972
| Final | 7/13/2007 | 7/13/2007 | 7/13/2007 4:02:44 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Isela Gutierrez...unable to locate secondary drain for attic furnace...combustibles above and at sides of gas coo-top not per manuf
|
MEC07-01828
| Rough-in | 7/13/2007 | 7/13/2007 | 7/13/2007 4:01:11 PM | P | PASS |
|
|
billy - reinspection - please call 1/2 hr prior to inspection Phone #: ###-####
|
MEC07-02465
| Rough-in | 7/13/2007 | 7/13/2007 | 7/13/2007 1:31:13 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Shelley Baisch...venting not complete...need manuf specs
|
MEC07-02309
| Pressure Test | 7/13/2007 | 7/13/2007 | 7/13/2007 1:30:10 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom..60lb u/g test to future new bldg ok
|
MEC07-01851
| Final | 7/12/2007 | 7/13/2007 | 7/13/2007 12:51:06 PM | P | PEND |
|
|
Roy ###-####...will final when other heating contractor is ready
|
MEC07-00311
| Final | 7/12/2007 | 7/13/2007 | 7/13/2007 12:42:30 PM | A | FAIL |
|
|
###-####...doors locked...called rachael
|
MEC07-01680
| Pressure Test | 7/13/2007 | 7/13/2007 | 7/13/2007 12:41:44 PM | A | PASS |
|
|
20lb test to fire pit ok
|
MEC07-01680
| Pressure Test | 7/12/2007 | 7/13/2007 | 7/13/2007 12:27:18 PM | A | CANC |
|
|
###-####
|
MEC07-01245
| Final | 7/12/2007 | 7/13/2007 | 7/13/2007 12:24:40 PM | A | PART |
|
|
Please call Shane before you head over to the jobsite for areas to be inspected. Thank you ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel...gas, hydronics for 2nd floor ok...the g/c wanted me to sign off on the shell/core. i told him tht permit wasn't called in and i didn't know if ymc's permit was finaled. the boiler on roof is ok for final on plumbing side only..dixie
|
MEC07-01245
| Rough-in | 7/12/2007 | 7/13/2007 | 7/13/2007 12:22:06 PM | A | PASS |
|
|
Please call Shane before you head over to the jobsite for areas to be inspected. Thank you ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
MEC07-02462
| Rough-in | 7/12/2007 | 7/13/2007 | 7/13/2007 12:21:16 PM | A | NR |
|
|
Please call Larry with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
MEC07-02461
| Rough-in | 7/12/2007 | 7/13/2007 | 7/13/2007 12:19:41 PM | A | NR |
|
|
Please call Larry with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|