Inspections for the day of: Monday, July 13, 2009.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM09-01079 Final7/13/20097/13/20097/13/2009 4:52:59 PMPPASS
scott Phone #: ###-####
PLM09-00994 Sprinkler (Final)7/12/20097/13/20097/13/2009 4:02:23 PMPPASS
Scheduled by a contractor via Hello! on 7/12/2009 at 8:55:38 PM. Contact: ###-####.
PLM09-01046 Final7/13/20097/13/20097/13/2009 3:43:11 PMPPASS
4 signs are posted and not potable labelling attached. Phone #: ###-#### Internet Inspection Request from: Bonnie Gilbert
PLM09-00697 Water and/or Sewer7/13/20097/13/20097/13/2009 1:50:00 PMPPASS
Dwayne Phone #: ###-####
PLM09-00668 Final7/10/20097/13/20097/13/2009 1:31:46 PMAPASS
Please contact Darren with any questions or concerns. Phone #: ###-#### Internet Inspection Request from: Diane Houst
PLM09-01064 Water Softner Final7/6/20097/13/20097/13/2009 11:34:44 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Kerrie Simpson
PLM09-01009 Water and/or Sewer7/10/20097/13/20097/13/2009 10:50:08 AMAFAIL
Michael actually at 1386 N arrow lane Phone #: ###-#### need to use ABS fitting with ABS pipe remove PVC fitting and replace with ABS contractor to recall when ready
PLM09-01059 Water and/or Sewer7/10/20097/13/20097/13/2009 9:14:14 AMAPASS
New main and drain and backflow installed, backflow has been tested and tagged. Location is behind gate on East side of yard. Thanks. Phone #: ###-#### Internet Inspection Request from: Sean McCullough
PLM09-01059 DOC - Permit Finaled7/13/20097/13/20097/13/2009 9:13:57 AMAPASS
New main and drain and backflow installed, backflow has been tested and tagged. Location is behind gate on East side of yard. Thanks. Phone #: ###-#### Internet Inspection Request from: Sean McCullough
PLM08-02505 Final7/10/20097/13/20097/13/2009 9:02:01 AMAPART
Brad ###-#### need to move trap primer connection to down stream side of premise protection double check in mechanical room contractor will recall when ready oked temp.
PLM08-02455 Water and/or Sewer7/13/20097/13/20097/13/2009 8:59:08 AMAPASS
PLM08-02455 DOC - Permit Finaled7/13/20097/13/20097/13/2009 8:58:56 AMAPASS