Inspections for the day of: Monday, July 13, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00087 Tracking Control7/9/20097/13/20097/13/2009 4:34:25 PMAPART
Cleaning up at the end of the day daily.
ESC07-01438 Conference7/13/20097/13/20097/13/2009 3:32:04 PMPFAIL
Left a message with RP to contact the city with what action will be taken to stabilize the lot. And when will it occur.
ESC09-00397 Site Preparation7/13/20097/13/20097/13/2009 2:20:03 PM FAIL
Verbal to RP:
Need to re-install silt fence to approved industry standards or use another type of sediment barrier installed properly per industry standards. Will re-inspect on 7/17/09 PM.
ESC08-00480 General Inspection7/13/20097/13/20097/13/2009 1:55:25 PM PASS
ESC09-00419 Site Preparation7/13/20097/13/20097/13/2009 1:36:38 PM FAIL
Verbal to RP:
1. Post ESC sign
2. Provide a concrete washout pit prior to any concrete pours.
3. Clean up and containerize all trash debris from Demo work.
Willl re-inspect on 7/20/09
ESC08-00585 General Inspection7/13/20097/13/20097/13/2009 1:17:01 PM PASS
no activity
ESC09-00121 Site Preparation7/2/20097/13/20097/13/2009 12:08:44 PMACANC
Not ready yet.
ESC09-00391 General Inspection7/6/20097/13/20097/13/2009 10:31:43 AMAPASS
ESC09-00104 BMP Violation7/10/20097/13/20097/13/2009 10:31:11 AMAFAIL
Correction Notice: (Verbal to RP)
1. Clean up all concrete spoils and residual next to the washout.
2. Provide a valid RP that has Day to Day control over all erosion and sediment issues.
* Failure to comply will result in a stop work order.* Will re-inspect on 7/14/09 PM.
ESC08-00577 General Inspection7/13/20097/13/20097/13/2009 9:04:45 AM PASS
ESC09-00286 General Inspection7/8/20097/13/20097/13/2009 8:42:46 AMAPASS
No discharging off of site. Knife River involved with the bridge project will be utilizing the north west basin for the pipe work for the Penn canal under Warmsprings Rd.