BLD09-01400
| BLD-Conference | 7/8/2010 | 7/9/2010 | | P | |
|
|
|
BLD09-02128
| BLD-Aging Inspection | 7/13/2010 | 7/13/2010 | 7/16/2010 3:56:44 PM | | DONE |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD09-02276
| BLD-Aging Inspection | 7/13/2010 | 7/13/2010 | 7/16/2010 3:54:31 PM | | DEFR |
|
|
no ele or insp. requisted for scope of work
|
BLD09-01820
| BLD-Aging Inspection | 7/13/2010 | 7/13/2010 | 7/16/2010 3:52:49 PM | | DEFR |
|
|
Mike Phone #: ###-#### need fire life saftey sign off.
|
BLD09-02027
| BLD-Aging Inspection | 7/13/2010 | 7/13/2010 | 7/16/2010 3:52:18 PM | | DEFR |
|
|
Mike Phone #: ###-#### need fire life saftey sign off.
|
BLD10-00034
| BLD-Aging Inspection | 7/13/2010 | 7/13/2010 | 7/16/2010 3:50:11 PM | | PASS |
|
|
|
ESC10-00435
| Site Preparation | 7/13/2010 | 7/13/2010 | 7/16/2010 2:40:23 PM | | PART |
|
|
460
|
ESC10-00434
| Site Preparation | 7/13/2010 | 7/13/2010 | 7/16/2010 2:40:01 PM | | PART |
|
|
460
|
ESC10-00438
| Site Preparation | 7/13/2010 | 7/13/2010 | 7/16/2010 2:39:39 PM | | PART |
|
|
460
|
BLD09-02072
| DOC - Permit Expired | 7/12/2010 | 7/13/2010 | 7/13/2010 4:44:59 PM | P | PASS |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD09-02029
| BLD-Final | 7/12/2010 | 7/13/2010 | 7/13/2010 4:43:49 PM | P | PART |
|
|
wip
|
BLD10-00550
| BLD-Other | 7/13/2010 | 7/13/2010 | 7/13/2010 2:40:17 PM | P | PASS |
|
|
Todd Phone #: ###-#### paripets filled with blow in insulation full to comply with type of const. to not have to sprinkler the areas.
|
ESC10-00226
| Random Inspection | 7/13/2010 | 7/13/2010 | 7/13/2010 2:38:32 PM | P | PASS |
|
|
|
BLD10-00550
| BLD-Conference | 7/12/2010 | 7/13/2010 | 7/13/2010 2:05:36 PM | A | PASS |
|
|
Todd Phone #: ###-#### roof deck insulated to 6 inches to meet ec report not 4 per drawring. ok
|
BLD10-01326
| BLD-Framing/Rough-in | 7/13/2010 | 7/13/2010 | 7/13/2010 2:03:13 PM | P | PASS |
|
|
Brian Phone #: ###-####
|
BLD10-01243
| BLD-Framing/Rough-in | 7/12/2010 | 7/13/2010 | 7/13/2010 1:30:37 PM | A | PASS |
|
|
Jeff Phone #: ###-####
|
ESC10-00459
| Random Inspection | 7/13/2010 | 7/13/2010 | 7/13/2010 1:29:47 PM | P | PASS |
|
|
|
BLD10-01268
| BLD-Conference | 7/12/2010 | 7/13/2010 | 7/13/2010 1:03:34 PM | A | PASS |
|
|
Samuel please call 15 min before going out Phone #: ###-####
|
ESC10-00226
| Random Inspection | 7/13/2010 | 7/13/2010 | 7/13/2010 9:40:34 AM | A | PASS |
|
|
|
BLD10-01180
| BLD-Footing | 7/12/2010 | 7/13/2010 | 7/13/2010 9:31:26 AM | A | PASS |
|
|
Jesse-Pouring at 10 am Phone #: ###-####
|
ESC10-00432
| Site Preparation | 7/13/2010 | 7/13/2010 | 7/13/2010 9:25:32 AM | A | PASS |
|
|
|