BLD12-01723
| FIRE-Final Inspection | 7/12/2012 | 7/13/2012 | 7/13/2012 3:56:38 PM | P | FAIL |
|
|
Build the Conference Room and provide sprinkler modifications for the overspaced head in the Break Room.
|
BLD12-01006
| FIRE-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 3:47:07 PM | P | CANC |
|
|
Per Tom the contractor is unable to be on site. Please reschedule for monday.
|
BLD12-01682
| FIRE-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 3:40:30 PM | P | FAIL |
|
|
The city approved plans were not on site but were at the main airport. Due to inspection load I was not able to waite for their worker to go get them. Rescheduled for monday.
|
BLD11-00179
| FIRE-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 3:36:31 PM | P | CANC |
|
|
Overbooked due to inspection load. Contractor notified.
|
FIR11-00442
| INSP-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 3:35:57 PM | P | CANC |
|
|
Overbooked due to inspection load. Contractor notified. I spoke to the installing electrician and deferred him to Romeo Gervais about the horn heights and the problem with placing the smoke detecotrs for door release within 5' and center of the doors. Romeo later called me back and stated that he is ok with the horn height as long as the required sound level is met but the smoke detectors for door release will need to meet code or an alternative will need to be proposed that meets the intent of the code. I also spoke to Jason with AEI about these issues.
|
FIR12-00324
| INSP-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 3:30:43 PM | P | CANC |
|
|
Overbooked due to inspection load. Contractor notified.
|
BLD12-00482
| FIRE-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 3:28:46 PM | P | PASS |
|
|
life safety passed
|
FIR12-00341
| INSP-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 3:27:28 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00332
| INSP-Sprinkler Rough-in | 7/12/2012 | 7/13/2012 | 7/13/2012 3:19:31 PM | A | FAIL |
|
|
Inspection was for the underground supply. No approved plans on site for inspection. I did note that the vertical rise of the underground supply needs to rise up under the house not under the footing. Also per my conversation with the fitter additional fittings had to be installed to pipe the underground. Also the underground supply piping, when it enters the crawl space, can not lay on the dirt. It must be attached directly to the bottom of the floor joists. It also appears that the underground supply may be utilizing a water meter. I spoke to Tom in Shilo's office of these issues.
|
FIR11-00578
| INSP-Final Inspection | 7/12/2012 | 7/13/2012 | 7/13/2012 12:56:58 PM | A | PASS |
|
|
Permit finaled
|
BLD12-00595
| FIRE-Final Inspection | 7/12/2012 | 7/13/2012 | 7/13/2012 12:56:23 PM | A | FAIL |
|
|
Provide a 2A,10BC fire extinguisher as discussed. Per Jim the absence of panic hardware on the north gate is ok.
|
BLD11-00179
| FIRE-Final Inspection | 7/11/2012 | 7/13/2012 | 7/13/2012 12:37:16 PM | A | CANC |
|
|
Duplicate inspection
|
FIR12-00322
| INSP-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 11:12:40 AM | A | PASS |
|
|
Permit finaled
|
BLD12-01481
| FIRE-Final Inspection | 7/12/2012 | 7/13/2012 | 7/13/2012 9:02:59 AM | A | PASS |
|
|
life safety passed. The two additional racks will be shown on the next racking submittal.
|
BLD12-00827
| FIRE-Final Inspection | 7/12/2012 | 7/13/2012 | 7/13/2012 8:41:34 AM | A | PASS |
|
|
life safety passed.
|
BLD12-01304
| FIRE-Final Inspection | 7/12/2012 | 7/13/2012 | 7/13/2012 8:36:01 AM | A | PASS |
|
|
life safety passed. Mall management is installing a single action lever on the exit door prior to the building inspection.
|
BLD12-00169
| FIRE-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 12:00:00 AM | P | CANC |
|
|
Dusty Phone #: ###-####
|