Inspections for the day of: Friday, July 13, 2012.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-01723 FIRE-Final Inspection7/12/20127/13/20127/13/2012 3:56:38 PMPFAIL
Build the Conference Room and provide sprinkler modifications for the overspaced head in the Break Room.
BLD12-01006 FIRE-Final Inspection7/13/20127/13/20127/13/2012 3:47:07 PMPCANC
Per Tom the contractor is unable to be on site. Please reschedule for monday.
BLD12-01682 FIRE-Final Inspection7/13/20127/13/20127/13/2012 3:40:30 PMPFAIL
The city approved plans were not on site but were at the main airport. Due to inspection load I was not able to waite for their worker to go get them. Rescheduled for monday.
BLD11-00179 FIRE-Final Inspection7/13/20127/13/20127/13/2012 3:36:31 PMPCANC
Overbooked due to inspection load. Contractor notified.
FIR11-00442 INSP-Final Inspection7/13/20127/13/20127/13/2012 3:35:57 PMPCANC
Overbooked due to inspection load. Contractor notified. I spoke to the installing electrician and deferred him to Romeo Gervais about the horn heights and the problem with placing the smoke detecotrs for door release within 5' and center of the doors. Romeo later called me back and stated that he is ok with the horn height as long as the required sound level is met but the smoke detectors for door release will need to meet code or an alternative will need to be proposed that meets the intent of the code. I also spoke to Jason with AEI about these issues.
FIR12-00324 INSP-Final Inspection7/13/20127/13/20127/13/2012 3:30:43 PMPCANC
Overbooked due to inspection load. Contractor notified.
BLD12-00482 FIRE-Final Inspection7/13/20127/13/20127/13/2012 3:28:46 PMPPASS
life safety passed
FIR12-00341 INSP-Final Inspection7/13/20127/13/20127/13/2012 3:27:28 PMPPASS
Permit finaled
FIR12-00332 INSP-Sprinkler Rough-in7/12/20127/13/20127/13/2012 3:19:31 PMAFAIL
Inspection was for the underground supply. No approved plans on site for inspection. I did note that the vertical rise of the underground supply needs to rise up under the house not under the footing. Also per my conversation with the fitter additional fittings had to be installed to pipe the underground. Also the underground supply piping, when it enters the crawl space, can not lay on the dirt. It must be attached directly to the bottom of the floor joists. It also appears that the underground supply may be utilizing a water meter. I spoke to Tom in Shilo's office of these issues.
FIR11-00578 INSP-Final Inspection7/12/20127/13/20127/13/2012 12:56:58 PMAPASS
Permit finaled
BLD12-00595 FIRE-Final Inspection7/12/20127/13/20127/13/2012 12:56:23 PMAFAIL
Provide a 2A,10BC fire extinguisher as discussed. Per Jim the absence of panic hardware on the north gate is ok.
BLD11-00179 FIRE-Final Inspection7/11/20127/13/20127/13/2012 12:37:16 PMACANC
Duplicate inspection
FIR12-00322 INSP-Final Inspection7/13/20127/13/20127/13/2012 11:12:40 AMAPASS
Permit finaled
BLD12-01481 FIRE-Final Inspection7/12/20127/13/20127/13/2012 9:02:59 AMAPASS
life safety passed. The two additional racks will be shown on the next racking submittal.
BLD12-00827 FIRE-Final Inspection7/12/20127/13/20127/13/2012 8:41:34 AMAPASS
life safety passed.
BLD12-01304 FIRE-Final Inspection7/12/20127/13/20127/13/2012 8:36:01 AMAPASS
life safety passed. Mall management is installing a single action lever on the exit door prior to the building inspection.
BLD12-00169 FIRE-Final Inspection7/13/20127/13/20127/13/2012 12:00:00 AMPCANC
Dusty Phone #: ###-####