Inspections for the day of: Friday, July 13, 2012.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00677 Site Preparation7/13/20127/13/20127/13/2012 4:07:49 PM NR
ESC11-00525 Conference7/13/20127/13/20127/13/2012 4:07:22 PMPPART
Approved the Dewatering plan that was given. They have designed a detention pond that will hold water through out the dewatering peroid of the constrution project that will include all utility work. The contractor (Brown Construction) will ammend the dewatering plan if the plan that is provided fails. The ammended plan must be resubmitted to the city for approval before any further dewatering activities can occur.
ESC12-00592 DOC - Permit Finaled7/13/20127/13/20127/13/2012 1:40:43 PMPPASS
Site stabilized with rock.
ESC10-00495 BMP Violation7/13/20127/13/20127/13/2012 1:38:51 PMAFAIL
Verbal to RP:
Provide sdiment barriers along the perimeter of the draw where potental run off could effect the new home at the bottom of the draw. Perimeter control are the minimum. Checks to break up slope would be an option for the contractor to impliment to slow down potental velocity if drainage off of the disturbed soil occurred.
ESC12-00149 Aging Inspection7/13/20127/13/20127/13/2012 1:35:35 PM DONE
Permit finaled.
ESC12-00149 DOC - Permit Finaled7/13/20127/13/20127/13/2012 1:35:26 PMPPASS
ESC12-00460 General Inspection7/13/20127/13/20127/13/2012 1:35:02 PM DONE
Permit finaled . Greenbelt stablilzed with sod.
ESC12-00460 DOC - Permit Finaled7/13/20127/13/20127/13/2012 1:34:30 PMPPASS
ESC12-00539 BMP Violation7/11/20127/13/20127/13/2012 1:29:32 PMAPASS
ESC12-00707 Site Preparation7/13/20127/13/20127/13/2012 11:22:31 AM PART
Sign need to be post atthe front of the project area.
ESC12-00557 Site Preparation7/13/20127/13/20127/13/2012 11:22:07 AM FAIL
Verbal to Doug Lasher:
Provide sediment barrier along the back of curb. Relocate washout to a level area of the project where access is an ease. Will re-inspect on 7/16/2012