Inspections for the day of: Friday, July 13, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-02649 Final7/12/20187/13/20187/13/2018 3:48:28 PMPPART
This is a partial final inspection. Contact is Andy Chambers. Phone #: ###-#### Inspection requested via web by Scott Campbell...partial final....
pharmacy-ok
locker rooms-ok
OR-ok
breakroom-ok
last office in hall-ok
PACU-ok grid and final
nurse station-ok
office, bathroom, breakroom, and storage
ELE18-01631 Final7/12/20187/13/20187/13/2018 2:11:59 PMPPASS
garage code 1001e Phone #: ###-#### Inspection requested via web by Alan Lusk...ok to final
ELE18-01763 Final7/13/20187/13/20187/13/2018 1:57:10 PMPPASS
ok to final
ELE18-02083 Final7/13/20187/13/20187/13/2018 1:33:25 PMPCANC
Garage Code 1001e Phone #: ###-#### Inspection requested via web by Alan Lusk...wrong permit scheduled
ELE18-01816 Final7/13/20187/13/20187/13/2018 12:46:20 PMPPASS
Please call Ryan ###-#### when you are enroute. Thank YOu Phone #: ###-#### Inspection requested via web by Clayton Morgan...corrections made...ok to final
ELE18-02545 Permanent Service7/9/20187/13/20187/13/2018 12:25:38 PMPPASS
Phone #: ###-#### Inspection requested via web by Craig Korell...p/s o/h reconnect ok
ELE18-00849 Conference7/13/20187/13/20187/13/2018 11:52:43 AMAPASS
wall discussion...met with Mike Jordan and discussed walls that are rated as "plenum walls"..not marked on plans...made contact with Ryan at EEG (electrical contractor supervisor) which made contact with general and is stopping wall cover on previous approved walls. Electrical wiring has been done vertically and horizontally in walls. Re-engineering of walls may be done to deal with plenum rating.
ELE18-02633 Final7/12/20187/13/20187/13/2018 11:14:01 AMAPASS
Robert Phone #: ###-####...replaced fused disconnect and rewhipped A/C..ok to final
ELE18-01751 Final7/12/20187/13/20187/13/2018 10:11:00 AMAPASS
Brad Phone #: ###-####...ok to final
ELE13-03214 DOC - Permit Expired7/13/20187/13/20187/13/2018 10:10:18 AMAPASS
permit expired
ELE18-02544 Electrical Rough-In7/13/20187/13/20187/13/2018 9:35:10 AMAPASS
Call 20 mins before- Charles Phone #: ###-####...circuit from sub panel, sch 80 pvc ran on exterior to disconnect, #6 and #8 THHN, GFI breaker in disconnect...will schedule final once tub delivered and hooked up
ELE18-02544 Conference7/9/20187/13/20187/13/2018 9:33:04 AMAPASS
Call 20 mins before- Charles Phone #: ###-####...discussed wire size, GFI protection, and location of tub...homeowner capable of work...rough in scheduled
ELE18-01816 Final7/12/20187/13/20187/13/2018 8:35:25 AMAFAIL
Please call Ryan ###-#### when you are enroute. Thank You Phone #: ###-#### Inspection requested via web by Clayton Morgan...all outlets serving kitchen countertop shall have GFCI protection...outlet within 6ft sink shall have GFCI protection...outlet to right of sink
ELE18-01883 Final7/12/20187/13/20187/12/2018 10:38:32 AMAPASS
Phone #: ###-#### Inspection requested via web by BRS Permitting...ok to final...labelling, disconnect, and OCPD ok