FIR20-00384
| INSP-Final Inspection | 7/9/2020 | 7/13/2020 | 7/13/2020 3:57:24 PM | A | CANC |
|
|
Prior to testing I need verification from Ansul the coverage is not required in plenum spaces. As early as possible Phone #: 2084777315 >> Inspection requested via mobile web by Matt Robison
|
FIR20-00385
| INSP-Final Inspection | 7/9/2020 | 7/13/2020 | 7/13/2020 3:57:05 PM | A | CANC |
|
|
Prior to testing I need verification from Ansul the coverage is not required in plenum spaces. As early as possible Phone #: 2084777315 >> Inspection requested via mobile web by Matt Robison
|
FIR19-00785
| INSP-Conference | 7/10/2020 | 7/13/2020 | 7/13/2020 11:05:18 AM | A | CANC |
|
|
I spoke to Tanner about the need to get their bond current with the State Fire Marshals office prior to an inspection. Email has been sent to Joe and Mark. I spoke to Knute with the State Fire Marshal's office. screened // Tanner Phone #: ###-####
|
FIR20-00208
| INSP-Sprinkler Rough-in | 7/9/2020 | 7/13/2020 | 7/13/2020 9:47:02 AM | A | PART |
|
|
I left a correction notice the heat/insulation will be required to maintain a 40 degree min. as per NFPA 13. I also noted that the current approved plans do not match the installation. Mike Martin is the contact. Thank you Phone #: ###-#### Inspection requested via web by jeremiah robison
|